OSHA Inspection: POWER DESIGN INC

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of POWER DESIGN INC in 227 TINGEY STREET SE, WASHINGTON, DC 20003 (NAICS 238210). OSHA activity number 343945051.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Power Design INC for free Get an email when a new federal OSHA severe-injury report for Power Design INC is published. One employer, no account, unsubscribe in one click.
Establishment
POWER DESIGN INC
Site address
227 TINGEY STREET SE
City
WASHINGTON
State
DC
ZIP
20003
Mailing
11600 NINTH ST, SAINT PETERSBURG, FL 33716
Inspection type
Unprogrammed Related (G)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238210
Employees
500
Ownership type
Private (A)

2 citations on file for this inspection.

1926.416 A01

Other-than-serious 1 instance 3 exposed
Issued
Oct 9, 2019
Abate by
Oct 16, 2019
Penalty
Initial $13,260 · Current $13,260
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means    a) On or about April 9, 2019; basement level; employees were running electrical cables into an energized switchgear exposing them to 480 volts.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet); in addition, documentation demonstrating the abatement is complete must be included with your certification.  This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (O) $13260
  • · Z (S) $13260

1904.39 A02

Deleted Other-than-serious 1 instance 1 exposed
Issued
Oct 9, 2019
Penalty
Initial $8,856 · Current $0 Reduced
29 CFR 1904.39(a)(2): The employer did not report within 24-hours a work-related incident resulting in in-patient hospitalization, amputation or the loss of an eye.  (a) On or about April 9, 2019, an employee was hospitalized after sustaining a fractured left arm, and it was not reported to OSHA until April 16, 2019.       No abatement certification or documentation required for this item.
Recent events (2)
  • · I (O) $0
  • · Z (O) $8856

View Power Design INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 343945051.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.