Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,194,531Inspections Most recent open 2026-08-11 Last loaded 2026-08-14

OSHA Inspection: RUEBEN BALTZAR DIEGO

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RUEBEN BALTZAR DIEGO in LOT 79 KINGSBRIDGE LANE SE, OWENS CROSS ROADS, AL 35763 (NAICS 238140). OSHA activity number 343959904.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Rueben Baltzar Diego for free Get an email when a new federal OSHA severe-injury report for Rueben Baltzar Diego is published. One employer, no account, unsubscribe in one click.
Site address
LOT 79 KINGSBRIDGE LANE SE
City
OWENS CROSS ROADS
State
AL
ZIP
35763
Mailing
1037 MOULTON STREET NW, DECATUR, AL 35601
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
4
Ownership type
A

10 citations on file for this inspection.

1903.19 D01

Other-than-serious 1 instance 4 exposed
Issued
Sep 3, 2019
Abate by
Oct 21, 2019
Penalty
Initial $319 · Current $319
29 CFR 1903.19(d)(1): The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required:  (a) On or about 07/18/2019-07/25/2019 - The employer failed to submit abatement documentation for Citation 1 Item 1; Citation 1 Item 2; Citation 1 Item 3; Citation 1 Item 4; Citation 1 Item 5a-5b; Citation 1 Item 6; and Citation 1 Item 7a-7b as required.
Recent events (1)
  • · Z (O) $319

1926.59

Serious Gravity 5 1 instance 4 exposed
Issued
Jul 8, 2019
Abate by
Jul 25, 2019
Penalty
Initial $2,842 · Current $2,842
29 CFR 1926.59: The employer had not developed a written hazard communication program in accordance with 29 CFR 1910.1200, as incorporated by reference:  a) On or about 04/24/2019 - Lot #79 Kingsbridge Lane SE, Owens Cross Roads, AL, the employer had not developed a written program for employees mixing Type N Portland Cement.
Recent events (1)
  • · Z (S) $2842

1926.102 A01

Serious Gravity 5 1 instance 4 exposed
Issued
Jul 8, 2019
Abate by
Jul 18, 2019
Penalty
Initial $2,842 · Current $2,842
29 CFR 1926.102(a)(1): Employees were not provided with eye and face protection equipment when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents:  a) On or about 04/24/2019 - Lot #79 Kingsbridge Lane SE, Owens Cross Roads, AL, employees handling CEMEX masonry cement were not wearing safety glasses.
Recent events (1)
  • · Z (S) $2842

1926.300 B03

Serious Gravity 5 1 instance 4 exposed
Issued
Jul 8, 2019
Abate by
Jul 22, 2019
Penalty
Initial $3,410 · Current $3,410
29 CFR 1926.300(b)(3): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:  a) On or about 04/24/2019 - Lot #79 Kingsbridge Lane SE, Owens Cross Roads, AL, a Whiteman mixer was being operated to mix mortar, sand, and water with unguarded rotating parts.
Recent events (1)
  • · Z (S) $3410

1926.451 B01

Serious Gravity 5 1 instance 4 exposed
Issued
Jul 8, 2019
Abate by
Jul 18, 2019
Penalty
Initial $3,410 · Current $3,410
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):  a) On or about 04/24/2019 - Lot #79 Kingsbridge Lane SE, Owens Cross Roads, AL, employees installing bricks were working from scaffolding approximately 12 feet above the ground that was not fully planked at each level.
Recent events (1)
  • · Z (S) $3410

1926.451 C01 I

Serious Gravity 5 1 instance 4 exposed
Issued
Jul 8, 2019
Abate by
Jul 18, 2019
Penalty
Initial $3,410 · Current $3,410
29 CFR 1926.451(c)(1)(i): Guys, ties, and braces were not installed at locations where horizontal members support both inner and outer legs:  a) On or about 04/24/2019 - Lot #79 Kingsbridge Lane SE, Owens Cross Roads, AL, employees were working from scaffolding at approximately 12 feet above the ground that was missing adequate bracing.
Recent events (1)
  • · Z (S) $3410

1926.451 C02

Serious Gravity 5 1 instance 4 exposed
Issued
Jul 8, 2019
Abate by
Jul 18, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames,  or uprights did not bear on base plates, mud sills or other adequate firm foundation:  a) On or about 04/24/2019 - Lot #79 Kingsbridge Lane SE, Owens Cross Roads, AL, employees were working from scaffolding that was supported by bricks, wood, and blocks.
Recent events (1)
  • · Z (S) $0

1926.451 E01

Serious Gravity 5 1 instance 4 exposed
Issued
Jul 8, 2019
Abate by
Jul 18, 2019
Penalty
Initial $3,410 · Current $3,410
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access:   a) On or about 04/24/2019 - Lot #79 Kingsbridge Lane SE, Owens Cross Roads, AL, employees were climbing scaffolding frames and not provides a safe means of access.
Recent events (1)
  • · Z (S) $3410

1926.451 G01

Serious Gravity 10 1 instance 4 exposed
Issued
Jul 8, 2019
Abate by
Jul 18, 2019
Penalty
Initial $3,978 · Current $3,978
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section:  a) On or about 04/24/2019 - Lot #79 Kingsbridge Lane SE, Owens Cross Roads, AL, employees installing brick for a residential home at approximately 12 feet above the ground were not provided fall protection.
Recent events (1)
  • · Z (S) $3978

1926.454 A

Serious Gravity 10 1 instance 4 exposed
Issued
Jul 8, 2019
Abate by
Jul 18, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:   a) On or about 04/24/2019 - Lot #79 Kingsbridge Lane SE, Owens Cross Roads, AL, employees working from scaffolding while installing bricks did not recognize the fall hazards.
Recent events (1)
  • · Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343959904.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.