BROOKLYN, NY —
OSHA Inspection: AL-AMIN M. BASHIR
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of AL-AMIN M. BASHIR in 60 BEAUMONT STREET, BROOKLYN, NY 11235 (NAICS 238990). OSHA activity number 344028485.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- AL-AMIN M. BASHIR
- Site address
- 60 BEAUMONT STREET
- City
- BROOKLYN
- State
- NY
- ZIP
- 11235
- Mailing
- 6007 FORT HANILTON, 2F, BROOKLYN, NY 11219
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238990
- Employees
- 4
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.100 A
- Issued
- Sep 24, 2019
- Penalty
- Initial $2,273 · Current $1,100 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects. Site: 60 Beaumont Street Brooklyn, NY On or about 5/22/19 a) An employee engaged in hoisting operation was not wearing a protective helmet. An employee hoisting work material and equipment to the 4th level of a tubular welded frame scaffold was utilizing a hard hat.
Recent events (2)
- — I (S) $1100
- — Z (S) $2273
1926.451 B01
- Issued
- Sep 24, 2019
- Penalty
- Initial $3,978 · Current $2,050 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) Site: 60 Beaumont Street Brooklyn, NY On or about 5/22/19 a) An employee worked from the 4th level of a tubular welded frame scaffold and the work platform was not fully planked.
Recent events (2)
- — I (S) $2050
- — Z (S) $3978
1926.451 E01
- Issued
- Sep 24, 2019
- Penalty
- Initial $2,842 · Current $1,900 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. Site: 60 Beaumont Street Brooklyn, NY On or about 5/22/19 a) Employees worked from the 2nd and 4th level of a tubular welded frame scaffold which did not have a safe means of access. The employees used the scaffold components to access the working platform.
Recent events (2)
- — I (S) $1900
- — Z (S) $2842
1926.451 F07
- Issued
- Sep 24, 2019
- Penalty
- Initial $3,978 · Current $2,050 Reduced
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person. Site: 60 Beaumont Street Brooklyn, NY On or about 5/22/19 a) Employer did not ensure that the tubular welded frame scaffold was erected by a knowledgeable or competent person. The scaffold was not provided with guardrails, endrails, was not fully planked, the employees were not utilizing personal fall arrest and no save means of access was provided.
Recent events (2)
- — I (S) $2050
- — Z (S) $3978
1926.451 G01 VII
- Issued
- Sep 24, 2019
- Penalty
- Initial $3,978 · Current $2,900 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. Site: 60 Beaumont Street Brooklyn, NY On or about 5/22/19 a) An employee working from the 2nd level of a tubular welded frame scaffold was exposed to a fall of approximately 12 feet. The scaffold was not provided with a guardrail system and the employee was not utilizing personal fall arrest.
Recent events (2)
- — I (S) $2900
- — Z (S) $3978
1926.502 B10
- Issued
- Sep 24, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(b)(10): When guardrail systems are used at hoisting areas, a chain, gate or removable guardrail section was not placed across the access opening between guardrail sections when hoisting operations are not taking place. Site: 60 Beaumont Street Brooklyn, NY On or about 5/22/19 a) An employee hoisting work materials and equipment from the 4th level of a tubular welded frame scaffold was not utilizing fall protection. He was exposed to a fall hazard from approximately 40 feet.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 238990)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344028485.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.