Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: HAROS BROTHER COMPANY

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of HAROS BROTHER COMPANY in MORNINGSIDE DR AND HIGHLAND VISTA, NEW BRAUNFELS, TX 78130 (NAICS 237130). OSHA activity number 344040498.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Haros Brother Company — free Get an email when a new federal OSHA severe-injury report for Haros Brother Company is published. One employer, no account, unsubscribe in one click.
Site address
MORNINGSIDE DR AND HIGHLAND VISTA
City
NEW BRAUNFELS
State
TX
ZIP
78130
Mailing
7514 MANSFIELD HWY, KENNEDALE, TX 76060
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237130
Employees
100
Ownership type
A

2 citations on file for this inspection.

1926.652 C02 I

Serious Gravity 1 1 instance 2 exposed
Issued
Jul 1, 2019
Abate by
Jul 8, 2019
Penalty
Initial $3,978 · Current $2,387 Reduced
29 CFR 1926.652(c)(2)(i): Design of support systems, shield systems, or other protective systems that are drawn from manufacturer's tabulated data were not in accordance with all specifications, recommendations, and limitations issued or made by the manufacturer:  On or about May 29, 2019, at the site, the employer failed to ensure the trench box was placed properly in accordance with the Xterra Trench shield tabulated data. The trench box was below the soil approximately 18 inches where employees were installing PVC pipe.  Employees exposed to the hazard of being struck-by falling soil/rocks.
Recent events (2)
  • — I (S) $2386.8
  • — Z (S) $3978

1926.652 A01

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 1, 2019
Abate by
Jul 8, 2019
Penalty
Initial $6,630 · Current $3,978 Reduced
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c):  On or about May 28, 2019, at the site, the employer failed to ensure the employees were protected from cave-ins by an adequate protective system. Employees were installing communication lines outside the trench box which ranged in depth from approximately 6 feet to 8 feet. Employees exposed to cave-in hazards.
Recent events (2)
  • — I (S) $3978
  • — Z (S) $6630

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344040498.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.