Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: G. D. FULLER INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of G. D. FULLER INC. in 358 MAIN STREET, ARCADE, NY 14009 (NAICS 238160). OSHA activity number 344076534.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch G. D. Fuller INC. — free Get an email when a new federal OSHA severe-injury report for G. D. Fuller INC. is published. One employer, no account, unsubscribe in one click.
Establishment
G. D. FULLER INC.
Site address
358 MAIN STREET
City
ARCADE
State
NY
ZIP
14009
Mailing
4106 MAIN STREET, SCIO, NY 14880
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
7
Ownership type
A

3 citations on file for this inspection.

1926.100 A

Serious Gravity 1 1 instance 2 exposed
Issued
Sep 23, 2019
Penalty
Initial $1,232 · Current $600 Reduced
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:  a) On or about 6/4/19 at a roof replacement project located at 358 Main Street, Arcade, New York; employees working on the ground below active roof operations were not wearing hard hats.  NO ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • — I (S) $600
  • — Z (S) $1232

1926.451 B10

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 23, 2019
Penalty
Initial $1,642 · Current $1,200 Reduced
29 CFR 1926.451(b)(10): Scaffold components manufactured by different manufacturers were intermixed not allowing the components to fit together to maintain the scaffold's structural integrity:  a) On or about 6/4/19 at a roof replacement project located at 358 Main Street, Arcade, New York; employees were installing shingles on the roof of a 2 story building. The employees were using frame scaffold as a catch platform along the eaves. The casters were the wrong size for the scaffold frames had to be wired to the outside of the frame to support the scaffold.  NO CERTIFICATION ABATEMENT REQUIRED
Recent events (2)
  • — I (S) $1200
  • — Z (S) $1642

1926.501 B11

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 23, 2019
Penalty
Initial $2,053 · Current $1,200 Reduced
29 CFR 1926.501(b)(11): Each employee on a steep roof with unprotected sides and edges 6 feet or more above lower levels was not protected from falling by guardrail systems with toeboards, safety net systems, or personal fall arrest systems:  a) On or about 6/4/19 at a roof replacement project located at 358 Main Street, Arcade, New York; employees were installing shingles on the roof of a 2 story building with a 12 in 12 roof pitch and an employee was at the rake edge at a height of approximately 16 feet. There was no fall protection in use.  NO CERTIFICATION ABATEMENT REQUIRED
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2053

View G. D. Fuller INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344076534.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.