OSHA Inspection: ACME-SHOREY PRECAST CO., INC.

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of ACME-SHOREY PRECAST CO., INC. in 334 TREMONT STREET, CARVER, MA 02330 (NAICS 327390). OSHA activity number 344076542.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Acme-Shorey Precast CO., INC. — free Get an email when a new federal OSHA severe-injury report for Acme-Shorey Precast CO., INC. is published. One employer, no account, unsubscribe in one click.
Site address
334 TREMONT STREET
City
CARVER
State
MA
ZIP
02330
Mailing
P.O. BOX 374, N FALMOUTH, MA 02556
Inspection type
Federal Agency (M)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327390
Employees
45
Ownership type
A

7 citations on file for this inspection.

1910.147 C04 I

Deleted Serious Gravity 10 1 instance 3 exposed
Issued
Sep 30, 2019
Abate by
Nov 20, 2019
Penalty
Initial $9,282 · Current $0 Reduced
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:  Jobsite:  Procedures to prevent the control of potentially hazardous energy while setting up a 1500 Monolithic Turning Device were not developed or used exposing employees to struck-by and caught-in hazards.
Recent events (3)
  • — F (S) $0
  • — C (S) $9282
  • — Z (S) $9282

1910.179 J02 III

Other-than-serious 1 instance 6 exposed
Issued
Sep 30, 2019
Abate by
Nov 20, 2019
Penalty
Initial $7,956 · Current $0 Reduced
29 CFR 1910.179(j)(2)(iii):     Monthly inspections of hooks, with a certification record which includes the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier, of the hook inspected, were not performed
Recent events (3)
  • — F (O) $0
  • — C (S) $7956
  • — Z (S) $7956

1910.179 J03

Serious Gravity 5 1 instance 6 exposed
Issued
Sep 30, 2019
Abate by
Nov 20, 2019
Penalty
Initial $0 · Current $5,857
29 CFR 1910.179(j)(3): A complete periodic inspection of crane(s) had not been conducted in the past 12 months:     Jobsite:  The Yale 15-ton Crane model EEW15-25CB1916D4 serial 1687150A had not been inspected since March 1, 2018.
Recent events (3)
  • — F (S) $5856.5
  • — C (S) $0
  • — Z (S) $0

1910.184 C01

Other-than-serious 1 instance 3 exposed
Issued
Sep 30, 2019
Abate by
Nov 20, 2019
Penalty
Initial $6,630 · Current $0 Reduced
29 CFR 1910.184(c)(1): Sling(s) that were damaged or defective were used:    Facility:  A chain sling that had a damaged hook was attached to a 15-ton overhead crane and used to lift precast concrete products for movement around the facility.
Recent events (3)
  • — F (O) $0
  • — C (S) $6630
  • — Z (S) $6630

1910.184 D

Deleted Serious Gravity 5 1 instance 3 exposed
Issued
Sep 30, 2019
Abate by
Nov 20, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.184(d): Sling(s) and fastenings were not inspected each day or during use and were not removed from service when damaged or defective:  Facility:  Slings used for lifting precast concrete products, forms, and form stripping devices were not inspected each day before use and were not removed from use when damaged exposing employees to struck-by hazards.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.184 E03 I

Serious Gravity 5 1 instance 3 exposed
Issued
Sep 30, 2019
Abate by
Nov 20, 2019
Penalty
Initial $0 · Current $5,857
29 CFR 1910.184(e)(3)(i): A thorough periodic inspection of alloy steel chain slings was not made on a regular basis and/or were done at intervals greater than once every 12 months:    Facility: Various chain slings used with an overhead crane were not thoroughly inspected on a regular basis.
Recent events (3)
  • — F (S) $5856.5
  • — C (S) $0
  • — Z (S) $0

1904.30 A

Deleted Other-than-serious 1 instance 45 exposed
Issued
Sep 30, 2019
Abate by
Nov 20, 2019
Penalty
Initial $1,327 · Current $0 Reduced
29 CFR 1904.30(a): The employer did not maintain a separate OSHA 300 Log for each establishment that was in operation for one year or longer:  The employer maintained one OSHA 300 log for both permanently established locations.
Recent events (3)
  • — F (O) $0
  • — C (O) $1327
  • — Z (O) $1327

View Acme-Shorey Precast CO., INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344076542.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.