OSHA Inspection: THE ROSE CORPORATION

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of THE ROSE CORPORATION in 401 8TH STREET, READING, PA 19612 (NAICS 332999). OSHA activity number 344252622.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch The Rose Corporation — free Get an email when a new federal OSHA severe-injury report for The Rose Corporation is published. One employer, no account, unsubscribe in one click.
Site address
401 8TH STREET
City
READING
State
PA
ZIP
19612
Mailing
401 8TH STREET, READING, PA 19612
Inspection type
Federal Agency (M)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332999
Employees
54
Ownership type
A

6 citations on file for this inspection.

1910.147 C04 II

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 14, 2020
Abate by
Jun 5, 2020
Penalty
Initial $6,747 · Current $6,000 Reduced
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to items (a) through (d) of this section:    (a)  PRODUCTION AREA - The written energy control procedure for the King 100 vertical boring machine did not clearly outline the scope, rules, and techniques to be utilized to perform lock out tag out and de-energize the machine, on or about August 22, 2019.      Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $6000
  • — Z (S) $6747

1910.147 C06 I

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 14, 2020
Abate by
Jun 5, 2020
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:    (a)  PRODUCTION AREA - The employer had not conducted a periodic inspection of the lock out tag out procedures for machines in the facility since the year 2000, on or about August 22, 2019.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.212 A01

Serious Gravity 10 1 instance 3 exposed
Issued
Feb 14, 2020
Abate by
Dec 4, 2020
Penalty
Initial $13,494 · Current $11,400 Reduced
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:    (a)  PRODUCTION AREA - Employees operating the King 100 vertical milling machine were exposed to hazards associated with the rotating table of the machine, and also the parts that were being set-up and run on the machine, on or about August 22, 2019.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $11400
  • — Z (S) $13494

1910.132 D02

Other-than-serious 1 instance 54 exposed
Issued
Feb 14, 2020
Abate by
May 8, 2020
Penalty
Initial $0 · Current $0
29 CFR 1910.132(d)(2): The employer did not verify, through a written certification, that the required workplace hazard assessment had been performed:    (a)  PRODUCTION AREA - The employer did not certify that the workplace hazard assessment had been completed, on or about August 22, 2019.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.147 C07 I

Other-than-serious 1 instance 2 exposed
Issued
Feb 14, 2020
Abate by
Jun 5, 2020
Penalty
Initial $757 · Current $0 Reduced
29 CFR 1910.147(c)(7)(i): The employer did not provide adequate training to ensure that employees acquired the knowledge and skills required for the safe application, usage and removal of energy control devices:    (a)  PRODUCTION AREA - Employees operating machines in the production area did not receive instruction to ensure that they had an understanding of the requirements the lock out tag out program, on or about August 22, 2019.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $757

1910.147 C07 IV

Other-than-serious 1 instance 54 exposed
Issued
Feb 14, 2020
Abate by
Jun 5, 2020
Penalty
Initial $757 · Current $0 Reduced
29 CFR 1910.147(c)(7)(iv): The employer did not certify that employee training had been accomplished and kept up to date:    (a)  PRODUCTION AREA - The employer did not certify that employees had received lock out tag out training for authorized, affected, and other employees, on or about August 22, 2019.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $757

View The Rose Corporation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344252622.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.