Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: J.E. CONSTRUCTION

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of J.E. CONSTRUCTION in 144 SOUTH DUPONT HIGHWAY, NEW CASTLE, DE 19720 (NAICS 327310). OSHA activity number 344257712.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch J.E. Construction — free Get an email when a new federal OSHA severe-injury report for J.E. Construction is published. One employer, no account, unsubscribe in one click.
Establishment
J.E. CONSTRUCTION
Site address
144 SOUTH DUPONT HIGHWAY
City
NEW CASTLE
State
DE
ZIP
19720
Mailing
22881 RUN BRIDGE ROAD, GEORGETOWN, DE 19947
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327310
Employees
5
Ownership type
A

8 citations on file for this inspection.

1910.134 C

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 18, 2020
Abate by
Mar 13, 2020
Penalty
Initial $2,892 · Current $1,500 Reduced

Hazardous substances 159316109010

29 CFR 1910.134(c): The employer did not develop and implement a written respiratory protection program with required worksite-specific procedures and elements for required respirator use: (Construction Reference 1926.103)  (a) 144 S. Dupont Highway: New Castle, DE - On or about August 22, 2019, the employer failed to establish a written respiratory protection program for employees who are required to wear respirators during the mixing of Portland Cement.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $2892

1910.134 E01

Serious Gravity 1 1 instance 2 exposed
Issued
Feb 18, 2020
Abate by
Mar 13, 2020
Penalty
Initial $0 · Current $0
29 CFR 1910.134(e)(1): The employer did not provide a medical evaluation to determine the employee's ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace:  (a) 144 S. Dupont Highway: New Castle, DE - On or about August 22, 2019, the employer failed to ensure employees who are required to wear respirators during the mixing of Portland Cement, were medically evaluated prior to being required to use a respirator in the workplace.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.134 F02

Serious Gravity 1 1 instance 2 exposed
Issued
Feb 18, 2020
Abate by
Mar 13, 2020
Penalty
Initial $0 · Current $0
29 CFR 1910.134(f)(2): Employee(s) using tight-fitting facepiece respirators were not fit tested prior to initial use of the respirator:  (a) 144 S. Dupont Highway: New Castle, DE- On or about August 22, 2019, the employer did not ensure that employees required to wear a tight-fitting air-purifying respirator when mixing Portland Cement, were fit tested prior to initial respirator use.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.134 K

Serious Gravity 1 1 instance 2 exposed
Issued
Feb 18, 2020
Abate by
Mar 13, 2020
Penalty
Initial $0 · Current $0
29 CFR 1910.134(k): The employer did not provide comprehensive, understandable training which did not occur annually and/or more often if necessary:  (Construction Reference 1926.103)   (a) 144 S. Dupont Highway: New Castle, DE - On or about August 22, 2019, the employer failed to ensure employees who are required to wear respirators during the mixing of Portland Cement, received comprehensive and understandable Respiratory Protection Training.   Abatement Note:  Comprehensive training shall meet the requirements of paragraphs 1910.134(k)(1) - (k)(6)
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 E01

Serious Gravity 1 1 instance 2 exposed
Issued
Feb 18, 2020
Abate by
Mar 13, 2020
Penalty
Initial $1,735 · Current $1,000 Reduced
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:  a) 144 S. Dupont Highway New Castle, DE -  On or about August 22, 2019, the employer failed to develop and implement a written hazard communication program for employees who are exposed to hazardous chemicals, to include but not limited to Portland Cement.
Recent events (2)
  • — I (S) $1000
  • — Z (S) $1735

1910.1200 H01

Serious Gravity 1 1 instance 2 exposed
Issued
Feb 18, 2020
Abate by
Mar 13, 2020
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59)  a) 144 S. DuPont Highway New Castle, DE -  On or about August 22, 2019, the employer failed to inform and train employees exposed to hazardous chemicals, including but not limited to Portland Cement.  Abatement Note: Information and training must be conducted in accordance with paragraph (h) of this section.  Additionally, the training must address:  *  the hazards associated with exposure to Portland cement, including hazards associated with the cement's Cr(VI) and Silica content;  *  preventive measures, including proper use and care of PPE and the importance of proper hygiene practices; and  *  employee access to hygiene facilities, PPE, and information (including MSDSs).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1153 D02 I

Serious Gravity 1 1 instance 2 exposed
Issued
Feb 18, 2020
Abate by
Mar 13, 2020
Penalty
Initial $1,735 · Current $1,000 Reduced
29 CFR 1926.1153(d)(2)(i): The employer did not assess the exposure of each employee who was or may reasonably be expected to be exposed to respirable crystalline silica at or above the action level in accordance with either the performance option in paragraph (d)(2)(ii) or the scheduled monitoring option in paragraph (d)(2)(iii) of this section:  (a) 144 S. DuPont Highway: Newcastle, DE.- On or about August 22, 2019, the employer failed to assess the exposure of employees who may reasonably be expected to be exposed to respirable crystalline silica while mixing Portland Cement.
Recent events (2)
  • — I (S) $1000
  • — Z (S) $1735

1926.28 A

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 18, 2020
Abate by
Mar 13, 2020
Penalty
Initial $2,892 · Current $1,500 Reduced
29 CFR 1926.28(a): Appropriate personal protective equipment was not worn by employee(s) in all operations where there was exposure to hazardous conditions:  a) 144 S.DuPont Highway New Castle, DE - On or about August 22, 2019, the employer failed to ensure that appropriate personal protective equipment is worn to protect the skin from exposure to caustic chemicals.  The employees were not wearing gloves while engaged in activities involving Portland Cement.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $2892

View J.E. Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344257712.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.