OSHA Inspection: M COCHRAN STUCCO & PLASTERING, LLC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of M COCHRAN STUCCO & PLASTERING, LLC. in 26050 PREDAZZER LANE, DAPHNE, AL 36526 (NAICS 238140). OSHA activity number 344328133.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch M Cochran Stucco & Plastering, LLC. — free Get an email when a new federal OSHA severe-injury report for M Cochran Stucco & Plastering, LLC. is published. One employer, no account, unsubscribe in one click.
Site address
26050 PREDAZZER LANE
City
DAPHNE
State
AL
ZIP
36526
Mailing
9730 HARMONY RIDGE, SEMMES, AL 36575
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
4
Ownership type
A

2 citations on file for this inspection.

1926.451 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Oct 21, 2019
Abate by
Oct 29, 2019
Penalty
Initial $2,273 · Current $1,364 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Cross braces were used as a means of access:  a) At 26050 Predazzer Lane, Daphne, Al; on or about September 25, 2019: The employer failed to ensure a scaffold ladder was set-up which exposed an employee to fall hazards of 13 feet 11 inches in that the employee was allowed to climb the cross braces of the scaffold to access and egress the second buck level.
Recent events (2)
  • — I (S) $1364
  • — Z (S) $2273

1926.451 G01

Serious Gravity 5 1 instance 1 exposed
Issued
Oct 21, 2019
Abate by
Oct 29, 2019
Penalty
Initial $2,273 · Current $1,364 Reduced
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section:  a) At 26050 Predazzer Lane, Daphne, Al; on or about September 25, 2019: The employer failed to ensure fall protection was available prior to allowing his employee to conduct work on the second level buck of a scaffold exposing the employee to fall hazards of 13 feet 11 inches.
Recent events (2)
  • — I (S) $1364
  • — Z (S) $2273

View M Cochran Stucco & Plastering, LLC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344328133.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.