FLUSHING, NY —
OSHA Inspection: TEMCO CONSTRUCTION NY INC
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of TEMCO CONSTRUCTION NY INC in 140-60 BEECH AVE., FLUSHING, NY 11355 (NAICS 238140). OSHA activity number 344393277.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TEMCO CONSTRUCTION NY INC
- Site address
- 140-60 BEECH AVE.
- City
- FLUSHING
- State
- NY
- ZIP
- 11355
- Mailing
- 159-10 MYER AVE., JAMAICA, NY 11433
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 17
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.451 G03 I
- Issued
- Oct 29, 2019
- Abate by
- Nov 4, 2019
- Penalty
- Initial $3,789 · Current $2,274 Reduced
General-duty citation text
29 CFR 1926.451(g)(3)(i): vertical lifelines were not fastened to a fixed safe point of anchorage, independent of the scaffold, and protected from sharp edges and abrasion. (a) At the worksite - Employees working from suspended scaffolds at 13 and 24 feet above the ground were attached to lifeline that were not provided abrasion protection over the parapet on the roof; on or about 10/21/19. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM IN THE ACCORDANCE WITH 29 CFR 1903.19
Recent events (2)
- — I (S) $2274
- — Z (S) $3789
1910.1200 E01
- Issued
- Oct 29, 2019
- Abate by
- Nov 25, 2019
- Penalty
- Initial $212 · Current $128 Reduced
General-duty citation text
29 CFR 1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii): (a) At the worksite - The employer did not maintain a written Hazard Communication Program for chemicals such as but not limited to NP 1 Polyurethane Sealant and Oil Based Enamel paint: on or about 10/21/19. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM IN THE ACCORDANCE WITH 29 CFR 1903.19 Temco Construction NY Inc. WAS PREVIOUSLY CITED FOR A SERIOUS VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD, 29 CFR 1910.1200(e)(1), WHICH WAS CONTAINED IN THE OSHA INSPECTION NUMBER 2, CITATION 2, ITEM b, ISSUED ON 06/03/2016. THE CITATION BECAME FINAL ORDER ON 07/22/16.
Recent events (2)
- — I (R) $128
- — Z (R) $212
1910.1200 G01
- Issued
- Oct 29, 2019
- Abate by
- Nov 25, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(g)(1): Employers did not have a safety data sheet in the workplace for each hazardous chemical which they use: (a) At the worksite - The employer did maintain safety data sheet for hazardous chemicals such as, but not limited to, NP 1 Polyurethane Sealant and Oil Based Enamel paint: on or about 10/21/19. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM IN THE ACCORDANCE WITH 29 CFR 1903.19 Temco Construction NY Inc. WAS PREVIOUSLY CITED FOR A SERIOUS VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD, 29 CFR 1910.1200(g)(8), WHICH WAS CONTAINED IN THE OSHA INSPECTION NUMBER 2, CITATION 2, ITEM b, ISSUED ON 06/03/2016. THE CITATION BECAME FINAL ORDER ON 07/22/16.
Recent events (2)
- — I (R) $0
- — Z (R) $0
1910.1200 H
- Issued
- Oct 29, 2019
- Abate by
- Nov 25, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(h): Employees were not provided effective information and training as specified in 29 CFR 1910.1200(h)(1) and -2 on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard was introduced: (a) At the worksite - Employees who used hazardous chemicals such, as but not limited to, NP 1 Polyurethane Sealant and Oil Based Enamel paint were not provided training in the hazard communication standard; on or about 10/21/19. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM IN THE ACCORDANCE WITH 29 CFR 1903.19 Temco Construction NY Inc. WAS PREVIOUSLY CITED FOR A SERIOUS VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD, 29 CFR 1910.1200(g)(8), WHICH WAS CONTAINED IN THE OSHA INSPECTION NUMBER 2, CITATION 2, ITEM b, ISSUED ON 06/03/2016. THE CITATION BECAME FINAL ORDER ON 07/22/16.
Recent events (2)
- — I (R) $0
- — Z (R) $0
More inspections at Temco Construction NY INC
View Temco Construction NY INC's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344393277.