Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: DEAL CONSTRUCTION

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of DEAL CONSTRUCTION in 31-33 S. 5TH ST., EASTON, PA 18042 (NAICS 238160). OSHA activity number 344417340.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Deal Construction — free Get an email when a new federal OSHA severe-injury report for Deal Construction is published. One employer, no account, unsubscribe in one click.
Establishment
DEAL CONSTRUCTION
Site address
31-33 S. 5TH ST.
City
EASTON
State
PA
ZIP
18042
Mailing
157 ROBIN HOOD RD., CLIFTON, NJ 07013
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
6
Ownership type
A

1 citation on file for this inspection.

1926.501 B13

Serious Gravity 10 1 instance 4 exposed
Issued
Dec 18, 2019
Abate by
Dec 30, 2019
Penalty
Initial $3,978 · Current $3,978
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b):   a) 31-33 S. 5th St., Easton, PA, Worksite, Roof - on or about October 24, 2019, employees were performing residential roofing work, approximately 15 to 30 feet above grade, without utilizing any means of fall protection.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $3978

View Deal Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344417340.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.