Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: RAUSCH INFRASTRUCTURE LLC

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of RAUSCH INFRASTRUCTURE LLC in HARLEM & CALSAG CANAL, PALOS HEIGHTS, IL 60463 (NAICS 237310). OSHA activity number 344459045.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Rausch Infrastructure LLC — free Get an email when a new federal OSHA severe-injury report for Rausch Infrastructure LLC is published. One employer, no account, unsubscribe in one click.
Site address
HARLEM & CALSAG CANAL
City
PALOS HEIGHTS
State
IL
ZIP
60463
Mailing
1111 E. TOUHY AVE. SUITE 120, DES PLAINES, IL 60018
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237310
Employees
20
Ownership type
A

4 citations on file for this inspection.

1926.62 D01 III

Other-than-serious 1 instance 6 exposed
Issued
Jan 30, 2020
Penalty
Initial $2,313 · Current $2,313

Hazardous substances 1591

29 CFR 1926.62(d)(1)(iii): The employer did not collect personal samples representative of a full shift, including at least one sample for each job classification in each work area, either for each shift or for the shift with the highest exposure level:    a. On or about November 20, 2019, at a bridge worksite at Harlem Avenue & Cal Sag Canal, Palos Heights, IL, employees were required to drill and cut painted steel that contained lead and were not sampled to determine their exposure.
Recent events (2)
  • — I (O) $2313
  • — Z (S) $2313

1926.62 D02 II

Other-than-serious 1 instance 6 exposed
Issued
Jan 30, 2020
Penalty
Initial $0 · Current $0

Hazardous substances 1591

29 CFR 1926.62(d)(2)(ii): When the employer had any reason to believe that employee(s) had been exposed to lead in excess of the Permissible Exposure Limit (PEL) while performing a task not listed in 29 CFR 1926.62(d)(2)(i), until the employer performed an employee exposure assessment as required by 29 CFR 1926.62(d) and documented that the employee's lead exposure was not above the PEL, the employer did not treat the employee as if the employee was exposed above the PEL and did not implement employee protective measures as prescribed in 29 CFR 19126.62(d)(2)(v):    a. On or about November 20, 2019, at a bridge worksite at Harlem Avenue & Cal Sag Canal, Palos Heights, IL, employees were required to drill and cut painted steel that contained lead and did not treat the employees as if they were exposed above the PEL by implementing protective measures such as providing a change room.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.62 D02 V C

Other-than-serious 1 instance 4 exposed
Issued
Jan 30, 2020
Penalty
Initial $0 · Current $0

Hazardous substances 1591

29 CFR 1926.62(d)(2)(v)(C): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide to employees performing the tasks described in 29 CFR 1926.62(d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) with change areas in accordance with 29 CFR 1926.62(i)(2):    a. On or about November 20, 2019, at a bridge worksite at Harlem Avenue & Cal Sag Canal, Palos Heights, IL, ironworkers were required to drill and cut painted steel that contained lead and were not provided a change area.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.62 D02 V E

Deleted Serious Gravity 1 1 instance 4 exposed
Issued
Jan 30, 2020
Penalty
Initial $0 · Current $0

Hazardous substances 1591

29 CFR 1926.62(d)(2)(v)(E): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide to employees performing the tasks described in 29 CFR 1926.62(d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) with biological monitoring in accordance with 1926.62(j)(1)(i), to consist of blood sampling and analysis for lead and zinc protoporphyrin levels:   a. On or about November 20, 2019, at a bridge worksite at Harlem Avenue & Cal Sag Canal, Palos Heights, IL, ironworkers were required to drill and cut painted steel that contained lead and were not provided biological monitoring.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Rausch Infrastructure LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344459045.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.