PALOS HEIGHTS, IL —
OSHA Inspection: RAUSCH INFRASTRUCTURE LLC
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of RAUSCH INFRASTRUCTURE LLC in HARLEM & CALSAG CANAL, PALOS HEIGHTS, IL 60463 (NAICS 237310). OSHA activity number 344459045.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- RAUSCH INFRASTRUCTURE LLC
- Site address
- HARLEM & CALSAG CANAL
- City
- PALOS HEIGHTS
- State
- IL
- ZIP
- 60463
- Mailing
- 1111 E. TOUHY AVE. SUITE 120, DES PLAINES, IL 60018
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237310
- Employees
- 20
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.62 D01 III
- Issued
- Jan 30, 2020
- Penalty
- Initial $2,313 · Current $2,313
1591
General-duty citation text
29 CFR 1926.62(d)(1)(iii): The employer did not collect personal samples representative of a full shift, including at least one sample for each job classification in each work area, either for each shift or for the shift with the highest exposure level: a. On or about November 20, 2019, at a bridge worksite at Harlem Avenue & Cal Sag Canal, Palos Heights, IL, employees were required to drill and cut painted steel that contained lead and were not sampled to determine their exposure.
Recent events (2)
- — I (O) $2313
- — Z (S) $2313
1926.62 D02 II
- Issued
- Jan 30, 2020
- Penalty
- Initial $0 · Current $0
1591
General-duty citation text
29 CFR 1926.62(d)(2)(ii): When the employer had any reason to believe that employee(s) had been exposed to lead in excess of the Permissible Exposure Limit (PEL) while performing a task not listed in 29 CFR 1926.62(d)(2)(i), until the employer performed an employee exposure assessment as required by 29 CFR 1926.62(d) and documented that the employee's lead exposure was not above the PEL, the employer did not treat the employee as if the employee was exposed above the PEL and did not implement employee protective measures as prescribed in 29 CFR 19126.62(d)(2)(v): a. On or about November 20, 2019, at a bridge worksite at Harlem Avenue & Cal Sag Canal, Palos Heights, IL, employees were required to drill and cut painted steel that contained lead and did not treat the employees as if they were exposed above the PEL by implementing protective measures such as providing a change room.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1926.62 D02 V C
- Issued
- Jan 30, 2020
- Penalty
- Initial $0 · Current $0
1591
General-duty citation text
29 CFR 1926.62(d)(2)(v)(C): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide to employees performing the tasks described in 29 CFR 1926.62(d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) with change areas in accordance with 29 CFR 1926.62(i)(2): a. On or about November 20, 2019, at a bridge worksite at Harlem Avenue & Cal Sag Canal, Palos Heights, IL, ironworkers were required to drill and cut painted steel that contained lead and were not provided a change area.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1926.62 D02 V E
- Issued
- Jan 30, 2020
- Penalty
- Initial $0 · Current $0
1591
General-duty citation text
29 CFR 1926.62(d)(2)(v)(E): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide to employees performing the tasks described in 29 CFR 1926.62(d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) with biological monitoring in accordance with 1926.62(j)(1)(i), to consist of blood sampling and analysis for lead and zinc protoporphyrin levels: a. On or about November 20, 2019, at a bridge worksite at Harlem Avenue & Cal Sag Canal, Palos Heights, IL, ironworkers were required to drill and cut painted steel that contained lead and were not provided biological monitoring.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Rausch Infrastructure LLC
View Rausch Infrastructure LLC's full OSHA safety record →
More inspections in this industry (NAICS 237310)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344459045.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.