Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: CLEARY BUILDING CORP.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of CLEARY BUILDING CORP. in E9993 COUNTY ROAD P, WISCONSIN DELLS, WI 53965 (NAICS 236220). OSHA activity number 344459367.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Cleary Building Corp. — free Get an email when a new federal OSHA severe-injury report for Cleary Building Corp. is published. One employer, no account, unsubscribe in one click.
Site address
E9993 COUNTY ROAD P
City
WISCONSIN DELLS
State
WI
ZIP
53965
Mailing
P.O. BOX 930220, VERONA, WI 53593
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
650
Ownership type
A

4 citations on file for this inspection.

1926.453 B02 IV

Serious Gravity 1 1 instance 1 exposed
Issued
Jan 7, 2020
Abate by
Jan 15, 2020
Penalty
Initial $5,115 · Current $3,836 Reduced
29 CFR 1926.453(b)(2)(iv): Employee(s) working in an aerial lift were sitting or climbing on the edge of the basket:    On or about November 19, 2019 employee climbed the scissors lift guard railing onto a roof.
Recent events (2)
  • — I (S) $3836
  • — Z (S) $5115

1926.502 D16 III

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 7, 2020
Abate by
Jan 15, 2020
Penalty
Initial $10,229 · Current $5,114 Reduced
29 CFR 1926.502(d)(16)(iii): Personal fall arrest systems, when stopping a fall, shall be rigged such that an employee can neither free fall more than 6 feet (1.8 m), nor contact any lower level:    On or about November 19, 2019 employee was attached to a personal fall arrest system that was below the area the employee was working and fell onto a scissors lift basket floor.
Recent events (2)
  • — I (S) $5114
  • — Z (S) $10229

1926.502 D16 IV

Deleted Serious Gravity 5 1 instance 1 exposed
Issued
Jan 7, 2020
Abate by
Jan 15, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.502(d)(16)(iv): Personal fall arrest systems, when stopping a fall, did not bring an employee to a complete stop and/or and did not limit maximum deceleration distance to 3.5 feet (1.07 m):  On or about November 19, 2019 employee was attached to a personal fall arrest system that was anchored below the employee and fell greater than 3.5 feet from a roof onto a scissors lift basket floor.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.503 A02 III

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 7, 2020
Abate by
Feb 28, 2020
Penalty
Initial $6,819 · Current $5,114 Reduced
29 CFR 1926.503(a)(2)(iii): The employer did not assure that each employee has been trained, as necessary, by a competent person in the use and operation of guardrail systems, safety net systems, warning line systems, safety monitoring systems, controlled access zones, and other protection to be used.    On or about November 19, 2019 employees utilizing a personal fall arrest system and a JLG anchor point were not trained on the safe use and operation pertaining to the manufactures specifications of the equipment.
Recent events (2)
  • — I (S) $5114
  • — Z (S) $6819

View Cleary Building Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344459367.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.