OSHA Inspection: KENNY FISHER

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of KENNY FISHER in 949 N. HERMITAGE RD., HERMITAGE, PA 16148 (NAICS 238130). OSHA activity number 344463609.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Kenny Fisher — free Get an email when a new federal OSHA severe-injury report for Kenny Fisher is published. One employer, no account, unsubscribe in one click.
Establishment
KENNY FISHER
Site address
949 N. HERMITAGE RD.
City
HERMITAGE
State
PA
ZIP
16148
Mailing
9567 NORTH PARK AVE, NORTH BLOOMFIELD, OH 44450
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
5
Ownership type
A

6 citations on file for this inspection.

1926.20 B01

Serious Gravity 1 1 instance 4 exposed
Issued
Jan 22, 2020
Abate by
Feb 18, 2020
Penalty
Initial $1,735 · Current $1,735
29 CFR 1926.20(b)(1): The employer did not initiate and maintain accident prevention programs as necessary to comply with this part:   a) jobsite, 949 N Hermitage Rd. in Hermitage, PA.  On or about November 20, 2019, the employer did not initiate and maintain safety and health programs, in that, the company did not provide its employees with general safety and health rules  when performing construction activities.   ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1735

1926.451 C02 V

Serious Gravity 5 1 instance 4 exposed
Issued
Jan 22, 2020
Abate by
Feb 18, 2020
Penalty
Initial $2,892 · Current $2,892
29 CFR 1926.451(c)(2)(v): Fork-lifts were used to support scaffold platforms when the entire platform was not attached to the fork and the fork-lift is not moved horizontally while the platform is occupied:  a) jobsite, 949 N Hermitage Rd. in Hermitage, PA.  On or about November 20, 2019, a plywood platform was used on the forks of the JLG all-terrain forklift to lift employees to perform work including, but not limited to, accessing the dumpster.    ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2892

1926.602 C01 II

Serious Gravity 5 1 instance 4 exposed
Issued
Jan 22, 2020
Abate by
Feb 18, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.602(c)(1)(ii): Modifications or additions affecting the safe operation of the equipment were  made without the manufacturer's written approval:  a) jobsite, 949 N Hermitage Rd. in Hermitage, PA.  On or about November 20, 2019, a plywood platform was used on the forks of the JLG all-terrain forklift to lift employees to perform work including, but not limited to, accessing the dumpster.    ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.501 B11

Serious Gravity 10 1 instance 4 exposed
Issued
Jan 22, 2020
Penalty
Initial $4,048 · Current $4,048
29 CFR 1926.501(b)(11): Each employee on a steep roof with unprotected sides and edges 6 feet (1.8 m) or more above lower levels was not protected from falling by guardrail systems with toeboards, safety net systems, or personal fall arrest systems:  a) jobsite, 949 N Hermitage Rd. in Hermitage, PA.  On or about November 20, 2019, employees were not protected from falling 10 feet to the ground while performing roof work on a 6:12 pitch roof.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $4048

1926.503 B01

Other-than-serious 1 instance 4 exposed
Issued
Jan 22, 2020
Abate by
Feb 18, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written certification record:  a) jobsite, 949 N Hermitage Rd. in Hermitage, PA.  On or about November 20, 2019, employees were exposed to a 10-foot fall hazard while performing roof work. A record of fall protection training was not certified to verify that each employee had received fall protection training.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (O) $0

1910.178 L06

Other-than-serious 1 instance 4 exposed
Issued
Jan 22, 2020
Abate by
Feb 18, 2020
Penalty
Initial $0 · Current $0
29 CFR 1910.178(l)(6): The employer did not certify that each operator has been trained and evaluated as required by this paragraph (l): (REFERENCE 1926.602(d):  a) jobsite, 949 N Hermitage Rd. in Hermitage, PA.  On or about November 20, 2019, a JLG all-terrain forklift was operated by employees to lift shingles and roofing materials to the roof.  A record of forklift operator training was not certified to verify that each employee had received training to operate the forklift.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (O) $0

View Kenny Fisher's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344463609.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.