Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: RMAC CONSTRUCTION CORP

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RMAC CONSTRUCTION CORP in 4715 NEW UTRECHT AVE., BROOKLYN, NY 11219 (NAICS 236118). OSHA activity number 344492137.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Rmac Construction Corp — free Get an email when a new federal OSHA severe-injury report for Rmac Construction Corp is published. One employer, no account, unsubscribe in one click.
Site address
4715 NEW UTRECHT AVE.
City
BROOKLYN
State
NY
ZIP
11219
Mailing
512 E 5TH STREET, BROOKLYN, NY 11218
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
2
Ownership type
A

6 citations on file for this inspection.

1926.451 B01

Serious Gravity 10 1 instance 2 exposed
Issued
Apr 24, 2020
Abate by
Apr 30, 2020
Penalty
Initial $4,048 · Current $2,400 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii)    Location: 4715 New Utrecht Ave. Brooklyn NY  On or about: December 05, 2019    a) Employee performing façade work on a store front while on the fourth and third tier of a welded frame scaffold which was not fully planked
Recent events (2)
  • — I (S) $2400
  • — Z (S) $4048

1926.451 C01

Serious Gravity 5 1 instance 2 exposed
Issued
Apr 24, 2020
Abate by
Apr 30, 2020
Penalty
Initial $2,892 · Current $1,400 Reduced
29 CFR 1926.451(c)(1): Supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) were not restrained from tipping by guying, tying, bracing, or equivalent means, as set forth in subparagraphs (i) - (iii) of this paragraph.    Location: 4715 New Utrecht Ave. Brooklyn NY  On or about: December 05, 2019    a) Employees were working on a tubular welded frame  scaffold that was approximately 24 ft. in height and was not restrained from tipping.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2892

1926.451 E01

Serious Gravity 10 1 instance 2 exposed
Issued
Apr 24, 2020
Abate by
Apr 30, 2020
Penalty
Initial $4,048 · Current $2,400 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access.     Location: 4715 New Utrecht Ave. Brooklyn NY  On or about: December 05, 2019    a) Employees utilized the cross braces of a tubular welded frame scaffold as means of access.
Recent events (2)
  • — I (S) $2400
  • — Z (S) $4048

1926.451 G01 VII

Serious Gravity 10 1 instance 2 exposed
Issued
Apr 24, 2020
Abate by
Apr 30, 2020
Penalty
Initial $4,048 · Current $2,400 Reduced
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.    Location: 4715 New Utrecht Ave. Brooklyn NY  On or about: December 05, 2019    a) Employees working on the 3rd and 4th tiers of a tubular welded frame scaffold without being provided any fall protection.
Recent events (2)
  • — I (S) $2400
  • — Z (S) $4048

1926.454 A

Serious Gravity 5 1 instance 2 exposed
Issued
Apr 24, 2020
Abate by
May 6, 2020
Penalty
Initial $2,892 · Current $2,400 Reduced
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards.    Location: 4715 New Utrecht Ave. Brooklyn NY  On or about: December 05, 2019    a) Employee was not trained to recognize hazards associated with scaffolds.
Recent events (2)
  • — I (S) $2400
  • — Z (S) $2892

1926.451 F06

Serious Gravity 10 1 instance 2 exposed
Issued
Apr 24, 2020
Abate by
Apr 30, 2020
Penalty
Initial $4,048 · Current $0 Reduced
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6).Note:  Specify distances as indicated in table in paragraph (f)(6) of this section.    Location: 4715 New Utrecht Ave. Brooklyn NY  On or about: December 05, 2019    a) Employees working on a tubular welded frame baler scaffold that was erected within 3 feet of an electrical service drop.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4048

View Rmac Construction Corp's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344492137.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.