Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,197,549Inspections Most recent open 2026-08-27 Last loaded 2026-08-31

OSHA Inspection: NAZARETH CONSTRUCTION AND EXTERIORS INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of NAZARETH CONSTRUCTION AND EXTERIORS INC. in 1839 ASHLAND AVE., EVANSTON, IL 60201 (NAICS 238160). OSHA activity number 344495312.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Nazareth Construction and Exteriors INC. for free Get an email when a new federal OSHA severe-injury report for Nazareth Construction and Exteriors INC. is published. One employer, no account, unsubscribe in one click.
Site address
1839 ASHLAND AVE.
City
EVANSTON
State
IL
ZIP
60201
Mailing
910 E. OLD WILLOW ROAD #110, PROSPECT HEIGHTS, IL 60070
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
5
Ownership type
Private (A)

4 citations on file for this inspection.

1926.102 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Dec 16, 2019
Abate by
Dec 20, 2019
Penalty
Initial $2,273 · Current $1,500 Reduced
29 CFR 1926.102(a)(1): Employees were not provided with eye and face protection when machines or operations present potential eye or face injury from physical, chemical, or radiation agents:                  a) On or about December 4, 2019, employees were exposed to eye injury while operating nail guns without the benefit of eye protection.                 In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $1500
  • · Z (S) $2273

1926.501 B13

Serious Gravity 10 6 instances 6 exposed
Issued
Dec 16, 2019
Abate by
Dec 20, 2019
Penalty
Initial $3,978 · Current $2,000 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b):          a) On or about December 4, 2019, employees were exposed to the hazard of falling while working without fall protection from a pitched roof surface having a ground to eave height of (two stories) approximately 18 feet.         In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $2000
  • · Z (S) $3978

1926.1053 B22

Serious Gravity 10 1 instance 1 exposed
Issued
Dec 16, 2019
Abate by
Dec 20, 2019
Penalty
Initial $3,978 · Current $2,000 Reduced
29 CFR 1926.1053(b)(22): Employees using ladders were carrying objects or loads that could cause the employee to lose balance and fall:              a) On or about December 4, 2019, employees were exposed to the hazard of falling from elevations up to approximately 18 feet when required to climb portable ladders while carrying materials to a roof deck landing surface.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $2000
  • · Z (S) $3978

1926.503 B01

Other-than-serious 6 instances 6 exposed
Issued
Dec 16, 2019
Abate by
Feb 28, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.503(b)(1): The employer did not verify fall protection training by preparing a written certification record:               a) On or about December 4, 2019, the employer did not prepare written certification records related to employee fall protection training.              In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 344495312.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.