Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: SWANK CONSTRUCTION COMPANY, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SWANK CONSTRUCTION COMPANY, LLC in I-70 BRIDGE NEAR S. BROADWAY ST, WHEELING, WV 26003 (NAICS 237310). OSHA activity number 344522974.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Swank Construction Company, LLC — free Get an email when a new federal OSHA severe-injury report for Swank Construction Company, LLC is published. One employer, no account, unsubscribe in one click.
Site address
I-70 BRIDGE NEAR S. BROADWAY ST
City
WHEELING
State
WV
ZIP
26003
Mailing
632 HUNT VALLEY CIRCLE, NEW KENSINGTON, PA 15068
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237310
Employees
350
Ownership type
A

3 citations on file for this inspection.

1926.451 B01

Other-than-serious 1 instance 3 exposed
Issued
Jun 9, 2020
Penalty
Initial $8,193 · Current $3,277 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii)    (a) I-70 Bridge between S York St and S Broadway St - On or about 12/17/19, Employees were performing steel work from a fabricated frame scaffold which was not fully decked.
Recent events (2)
  • — I (O) $3277
  • — Z (S) $8193

1926.451 C02 I

Other-than-serious 1 instance 3 exposed
Issued
Jun 9, 2020
Penalty
Initial $8,193 · Current $3,277 Reduced
29 CFR 1926.451(c)(2)(i): Footings were not level, sound, rigid and capable of supporting the loaded scaffold without settling or displacement:    (a) I-70 Bridge between S York St and S Broadway St - On or about 12/17/19, employees were using a fabricated frame scaffold in which the base plate was displaced from its mud sill.    (b) I-70 Bridge between S York St and S Broadway St - On or about 12/17/19, employees were using a fabricated frame scaffold in which the base plate were damaged and bent.
Recent events (2)
  • — I (O) $3277
  • — Z (S) $8193

1926.452 C02

Other-than-serious 1 instance 3 exposed
Issued
Jun 9, 2020
Abate by
Jun 17, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally:    (a) I-70 Bridge between S York St and S Broadway St - On or about 12/17/19, employees were using a fabricated frame scaffold with missing diagonal cross braces.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

View Swank Construction Company, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344522974.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.