OSHA Inspection: TORRID LLC

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of TORRID LLC in 115 ENTERPRISE PKWY, WEST JEFFERSON, OH 43162 (NAICS 541614). OSHA activity number 344553482.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Torrid LLC — free Get an email when a new federal OSHA severe-injury report for Torrid LLC is published. One employer, no account, unsubscribe in one click.
Establishment
TORRID LLC
Site address
115 ENTERPRISE PKWY
City
WEST JEFFERSON
State
OH
ZIP
43162
Mailing
115 ENTERPRISE PKWY, WEST JEFFERSON, OH 43162
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
541614
Employees
845
Ownership type
A

2 citations on file for this inspection.

1910.147 D

Serious Gravity 10 1 instance 16 exposed
Issued
Feb 27, 2020
Abate by
Mar 17, 2020
Penalty
Initial $13,494 · Current $8,096 Reduced
29 CFR 1910.147(d): Application of control. The established procedures for the application of energy control (the lockout or tagout procedures) shall cover the following elements and actions and shall be done in the following sequence:  a. Located at 115 Enterprise Parkway, West Jefferson, Ohio: On or about January 04, 2020, employees were exposed to caught-in and nip point hazards while servicing the CRUZbelt conveyor system, M NO: M4201225 and M NO: M4201140, Tag: SH2002AD. The employer did not ensure that energy control application steps were implemented as the conveyor was not shut down or turned off to perform the servicing work of lubrication [per the 1910.147(d)(2) requirements]. As a result, the remaining applicable energy control elements, involving machine isolation [(d)(3)], LOTO device application [(d)(4)], and verification of isolation [(d)(6)], were not implemented to protect employees from the machine servicing hazards.
Recent events (2)
  • — I (S) $8096.4
  • — Z (S) $13494

1904.39 A02

Other-than-serious 1 instance 1 exposed
Issued
Feb 27, 2020
Penalty
Initial $9,639 · Current $5,783 Reduced
29 CFR 1904.39(a)(2): Basic Requirement. Within twenty-four (24) hours after the in-patient hospitalization of one or more employees or an employee's amputation or an employee's loss of an eye, as a result of a work-related incident, you must report the in-patient hospitalization, amputation, or loss of an eye to OSHA.  a.  Located at 115 Enterprise Parkway, West Jefferson, Ohio: On or about January 04, 2020, the employer did not report the employee's amputation to OSHA that resulted at the worksite location, within twenty-four hours.  The employee had amputated his right index finger as a result of the caught-in and nip point hazard at the worksite.
Recent events (2)
  • — I (O) $5783.4
  • — Z (O) $9639

View Torrid LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344553482.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.