OSHA Inspection: DELTA CONTRACTING GROUP, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DELTA CONTRACTING GROUP, INC. in 308 WEST 147TH ST., NEW YORK, NY 10039 (NAICS 238140). OSHA activity number 344643309.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Delta Contracting Group, INC. — free Get an email when a new federal OSHA severe-injury report for Delta Contracting Group, INC. is published. One employer, no account, unsubscribe in one click.
Site address
308 WEST 147TH ST.
City
NEW YORK
State
NY
ZIP
10039
Mailing
339A NORTH HIGH STREET, MOUNT VERNON, NY 10550
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
4
Ownership type
A

5 citations on file for this inspection.

1926.404 B01 I

Serious Gravity 5 1 instance 4 exposed
Issued
Jun 3, 2020
Abate by
Jun 15, 2020
Penalty
Initial $3,856 · Current $3,000 Reduced
29 CFR 1926.404(b)(1)(i): Employer did not use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites.       a) Exterior supported scaffold at the 4th floor level:       Employees used electric powered tools to do brick pointing. The tools were connected to extension cords, which were routed to temporary outlet devices installed on the roof, and were not provided with ground fault circuit interrupter. On or about 02/20/2020.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $3856

1926.404 F06

Serious Gravity 5 1 instance 4 exposed
Issued
Jun 3, 2020
Penalty
Initial $3,856 · Current $0 Reduced
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous.    a) Exterior supported scaffold at the 4th floor level:    Employees used electric powered tools to do brick pointing. A tool was connected to an extension cord, which was routed to a temporary outlet device installed on the roof, and was missing a ground pin. On or about 02/20/2020.
Recent events (2)
  • — I (S) $0
  • — Z (S) $3856

1926.405 A02 II I

Serious Gravity 5 1 instance 4 exposed
Issued
Jun 3, 2020
Penalty
Initial $3,856 · Current $0 Reduced
29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables used for temporary wiring were not protected from damage.    a) Roof:    Employees used electric powered tools to do brick pointing. A tool was connected to an extension cord, which was routed to a temporary outlet device installed on the roof. The extension cord was not provided with damage protection and was pinched by a metal plate. On or about 02/20/2020.
Recent events (2)
  • — I (S) $0
  • — Z (S) $3856

1926.502 D06

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 3, 2020
Abate by
Jun 11, 2020
Penalty
Initial $5,398 · Current $3,000 Reduced
29 CFR 1926.502(d)(6): Snaphooks were not designed for the following connection, and were engaged: directly to webbing, rope, or wire rope; to each other; and to a horizontal lifeline.    a) Exterior supported scaffold at the 4th floor level:    Employees worked from a supported scaffold platform and utilized a faulty fall arrest system with a horizontal lifeline for fall protection. Snaphooks on the employees' lanyards were engaged to other snaphooks, which are then engaged directly to a horizontal rope that was used as a horizontal lifeline. On or about 02/20/2020.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $5398

1926.502 D08

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 3, 2020
Abate by
Jun 11, 2020
Penalty
Initial $5,398 · Current $3,000 Reduced
29 CFR 1926.502(d)(8): Horizontal lifelines were not designed, installed, and used under the supervision of a qualified person, as part of a complete personal fall arrest system, which maintained a safety factor of at least two.    a) Exterior supported scaffold at the 4th floor level:    Employees installed a rope as a horizontal lifeline across the scaffold platform by hand tying it to two vertical frames of the supported scaffold. The horizontal lifeline was not designed, installed, and used under the supervision of a qualified person. On or about 02/20/2020.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $5398

View Delta Contracting Group, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344643309.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.