Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: GML BUILDERS, LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of GML BUILDERS, LLC in 105 WEST PARISH RD., CONCORD, NH 03303 (NAICS 238130). OSHA activity number 344679949.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch GML Builders, LLC — free Get an email when a new federal OSHA severe-injury report for GML Builders, LLC is published. One employer, no account, unsubscribe in one click.
Establishment
GML BUILDERS, LLC
Site address
105 WEST PARISH RD.
City
CONCORD
State
NH
ZIP
03303
Mailing
558 BELMONT ST., MANCHESTER, NH 03104
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
3
Ownership type
A

5 citations on file for this inspection.

1903.19 C01

Other-than-serious 3 instances 3 exposed
Issued
Jul 20, 2020
Abate by
Sep 3, 2020
Penalty
Initial $325 · Current $325
29 CFR 1903.19(c)(1): Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section:  a.  The employer did not furnish the abatement required for citations issued within 10 calendar days for Citation 1 Item 1 nor did they respond to the progress report letter sent May 29, 2020.  b.  The employer did not furnish the abatement required for citations issued within 10 calendar days for Citation 1 Item 2 nor did they respond to the progress report letter sent May 29, 2020.  c.  The employer did not furnish the abatement required for citations issued within 10 calendar days for Citation 1 Item 3 nor did they respond to the progress report letter sent May 29, 2020.
Recent events (1)
  • — Z (O) $325

1926.501 B13

Serious Gravity 10 3 instances 3 exposed
Issued
Apr 6, 2020
Penalty
Initial $4,048 · Current $4,048
29 CFR 1926.501(b)(13): Employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net systems or personal fall arrest systems:  Instance a. Site - On or about March 5, 2020, employees engaged in framing activities from the garage roof area were not provided with fall protection and were exposed to falls of over 10 feet.  Instance b. Interior second floor level - On or about March 5, 2020, employees were exposed to fall hazards where window openings were not guarded or blocked to prevent falls of over 10 feet.   Instance c. Interior second floor level - On or about March 5, 2020, employees were exposed to fall hazards where doors openings were not guarded or blocked to prevent falls of over 10 feet.
Recent events (1)
  • — Z (S) $4048

1926.1052 C01 II

Serious Gravity 5 1 instance 3 exposed
Issued
Apr 6, 2020
Abate by
Apr 10, 2020
Penalty
Initial $2,892 · Current $2,892
29 CFR 1926.1052(c)(1)(ii): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with one stairrail system along each unprotected side or edge:  Interior staircase - On or about March 5, 2020, the staircase utilized by the employees to access the second story work area was not provided with stair railing along the open sided staircase to prevent employees' fall hazards.
Recent events (1)
  • — Z (S) $2892

1926.1053 B04

Serious Gravity 5 1 instance 3 exposed
Issued
Apr 6, 2020
Abate by
Apr 10, 2020
Penalty
Initial $2,892 · Current $2,892
29 CFR 1926.1053(b)(4): Ladders shall be used only for the purpose for which they were designed:  Garage - On or about March 5, 2020, the 6 foot (Werner) stepladder was used for purposes for which it was not designed, where the stepladder was used as means of supporting the scaffolding system.
Recent events (1)
  • — Z (S) $2892

1926.1053 B16

Serious Gravity 1 1 instance 3 exposed
Issued
Apr 6, 2020
Penalty
Initial $1,735 · Current $1,735
29 CFR 1926.1053(b)(16): Portable ladders with structural defects, such as, but not limited to, broken or missing rungs, cleats, or steps, broken or split rails, corroded components, or other faulty or defective components, were not marked in a manner that readily identified them as defective, tagged with "Do Not Use" or similar language, or withdrawn from service until repaired:  Garage area - On or about March 5, 2020, the 8 foot (Werner) stepladder utilized for roof access was not adequate, where the ladder was broken and missing the rear support system for the ladder exposing the employees to a fall hazard.
Recent events (1)
  • — Z (S) $1735

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344679949.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.