OSHA Inspection: ASIF CONTRACTOR

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ASIF CONTRACTOR in 18 WEST 18TH STREET, ERIE, PA 16501 (NAICS 238910). OSHA activity number 344923222.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Asif Contractor — free Get an email when a new federal OSHA severe-injury report for Asif Contractor is published. One employer, no account, unsubscribe in one click.
Establishment
ASIF CONTRACTOR
Site address
18 WEST 18TH STREET
City
ERIE
State
PA
ZIP
16501
Mailing
14713 BUBBLING SPRING ROAD, BOYDS, MD 20841
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238910
Employees
9
Ownership type
A

12 citations on file for this inspection.

1926.25 A

Serious Gravity 1 2 instances 14 exposed
Issued
Oct 1, 2020
Abate by
Oct 28, 2020
Penalty
Initial $2,313 · Current $2,313
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, debris was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures:  A.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, first floor, center hallway near staircase, on or about September 24, 2020 and times prior thereto:  Employees were demolishing floor tiles.  The floor tiles that were accumulated in the hallway were not cleaned up during the course of demolition, and posed a trip and fall hazard.  B.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, first floor, south hallway near staircase, on or about September 24, 2020 and times prior thereto:  Employees were demolishing floor tiles.  The floor tiles that were accumulated in the hallway were not cleaned up during the course of demolition, and posed a trip and fall hazard.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2313

1926.34 C

Serious Gravity 1 2 instances 14 exposed
Issued
Oct 1, 2020
Abate by
Oct 28, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.34(c): Means of egress was not continually maintained free of all obstructions or impediments to full instant use in the case of fire or other emergency:  A.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, first floor, center hallway near staircase, on or about September 24, 2020 and times prior thereto:  Employees were demolishing floor tiles.  The floor tiles that were accumulated in the hallway were not cleaned up during the course of demolition, and posed a trip and fall hazard.  B.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, first floor, south hallway near staircase, on or about September 24, 2020 and times prior thereto:  Employees were demolishing floor tiles.  The floor tiles that were accumulated in the hallway were not cleaned up during the course of demolition, and posed a trip and fall hazard.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.134 C01

Serious Gravity 1 1 instance 1 exposed
Issued
Oct 1, 2020
Abate by
Nov 5, 2020
Penalty
Initial $2,313 · Current $2,313
29 CFR 1910.134(c)(1): A written respiratory protection program that included the provisions in 29 CFR 1910.134(c)(1)(i) - (ix) with worksite specific procedures was not established and implemented for required respirator use: (Construction Reference 1926.103)  A.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, on or about September 14, 2020 and times prior thereto: An employee assisting in painting operations was wearing a 3M half mask elastomeric respirator. The employer does not have a written respiratory protection program.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2313

1910.134 F01

Serious Gravity 1 1 instance 1 exposed
Issued
Oct 1, 2020
Abate by
Oct 28, 2020
Penalty
Initial $0 · Current $0
29 CFR 1910.134(f)(1): The employer did not ensure that employee(s) required to use a tight-fitting facepiece respirator passed the appropriate qualitative fit test (QLFT) or quantitative fit test (QNFT): (Construction Reference 1926.103)  A.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, on or about September 14, 2020 and times prior thereto: An employee assisting in painting operations was wearing a 3M half mask elastomeric respirator.  The employee did not receive respirator fit testing.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.134 E01

Serious Gravity 1 1 instance 1 exposed
Issued
Oct 1, 2020
Abate by
Oct 28, 2020
Penalty
Initial $0 · Current $0
29 CFR 1910.134(e)(1): The employer did not provide a medical evaluation to determine the employee's ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace: (Construction Reference 1926.103):   A.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, on or about September 14, 2020 and times prior thereto:  An employee assisting in painting operations was wearing a 3M half mask elastomeric respirator.  The employee did not receive a medical evaluation designed to determine their medical fitness to wear a respirator.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.1200 E01

Serious Gravity 1 1 instance 1 exposed
Issued
Oct 1, 2020
Abate by
Nov 5, 2020
Penalty
Initial $2,313 · Current $2,313
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met, and had not developed or implemented a written hazard communication program which at included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii): (Construction Reference: 1926.59)  A.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, on or about September 14, 2020 and times prior thereto:  An employee was assisting with a painting operations and was working with materials including, but not limited to, Sherwin Williams primer.  The employer did not have a written hazard communication program.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2313

1910.1200 G08

Serious Gravity 1 1 instance 1 exposed
Issued
Oct 1, 2020
Abate by
Oct 28, 2020
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(g)(8):   The employer did not maintain in the workplace copies of the required safety data sheets for each hazardous chemical:  A.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, on or about September 14, 2020 and times prior thereto:  An employee was assisting with a painting operations and was working with materials including, but not limited to, Sherwin Williams primer.  The employer did not have the safety data sheet for the material on-site.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.1200 H01

Serious Gravity 1 1 instance 1 exposed
Issued
Oct 1, 2020
Abate by
Oct 28, 2020
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59)  A.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, on or about September 14, 2020 and times prior thereto:  An employee was assisting with a painting operations and was working with materials including, but not limited to, Sherwin Williams primer.  The employee did not have hazard communication training.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.150 A01

Serious Gravity 1 1 instance 9 exposed
Issued
Oct 1, 2020
Abate by
Oct 28, 2020
Penalty
Initial $2,313 · Current $2,313
29 CFR 1926.150(a)(1): The employer did not develop and maintain a fire protection program to be followed throughout all phases of construction and demolition work, and/or did not provide for the firefighting equiment as specified in this subpart:  A.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, on or about September 11, 2020 and times prior thereto:  Employees were engaged in demolition and painting operations.  The employer did not have a fire protection program to ensure that proper fire extinguishment equipment was on-site.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2313

1926.150 C01 I

Serious Gravity 1 1 instance 9 exposed
Issued
Oct 1, 2020
Abate by
Oct 28, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.150(c)(1)(i): A fire extinguisher, rated not less than 2A, was not provided for each 3,000 square feet of the protected building area, or major fraction thereof:  A.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, on or about September 11, 2020 and times prior thereto:  Employees were engaged in demolition and painting operations.  Fire extinguishers were not distributed throughout building in the work areas.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.150 C01 IV

Serious Gravity 1 1 instance 9 exposed
Issued
Oct 1, 2020
Abate by
Oct 28, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.150(c)(1)(iv): One or more fire extinguishers, rated not less than 2A, were not provided on each floor:  A.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, on or about September 11, 2020 and times prior thereto:  Employees were engaged in demolition and painting operations.  Fire extinguishers were not distributed on each floor of the building in the work areas.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.151 C06

Serious Gravity 1 1 instance 9 exposed
Issued
Oct 1, 2020
Abate by
Oct 28, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.151(c)(6): Portable fire extinguishing equipment, suitable for the fire hazard(s) involved, was not provided at convenient, conspicuously accessible locations in the yard area:  A.)  Asif Contractor, 18 West 18th Street, Erie, PA 16501, on or about September 11, 2020 and times prior thereto:  Employees were engaged in demolition operations.  Fire extinguishers were not distributed throughout the yard areas where building materials, paint products, mineral spirits, and the accumulations of debris were located.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

View Asif Contractor's full OSHA safety record →