Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: RALPH E. TOLBERT MASONRY, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RALPH E. TOLBERT MASONRY, INC. in 2 NORTH MAIN STREET, CHAMBERSBURG, PA 17201 (NAICS 238140). OSHA activity number 344961743.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Ralph E. Tolbert Masonry, INC. — free Get an email when a new federal OSHA severe-injury report for Ralph E. Tolbert Masonry, INC. is published. One employer, no account, unsubscribe in one click.
Site address
2 NORTH MAIN STREET
City
CHAMBERSBURG
State
PA
ZIP
17201
Mailing
950 HOLLYWELL AVENUE, CHAMBERSBURG, PA 17201
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
20
Ownership type
A

3 citations on file for this inspection.

1926.451 B01 I

Serious Gravity 1 1 instance 2 exposed
Issued
Nov 4, 2020
Abate by
Dec 2, 2020
Penalty
Initial $4,048 · Current $3,036 Reduced
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary:  (a) East Side of New Building - Employees worked from mast climbing scaffolds, erected end to end along the building's east side, to install the brick facing on the building.  A gap of about 8 inches existed between the main platform level on the Premier mast climber and the adjacent Hydro Mobile mast climber, exposing employees to the hazards of tripping in or stepping into or through this gap, on or about October 6, 2020.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $3036
  • — Z (S) $4048

1926.451 B07

Serious Gravity 1 1 instance 2 exposed
Issued
Nov 4, 2020
Penalty
Initial $3,441 · Current $2,580 Reduced
29 CFR 1926.451(b)(7): On scaffolds where platforms are overlapped to create a long platform, the overlap was not at least 12 inches (30 cm) and the platforms were not nailed together or otherwise restrained to prevent movement:  (a) East Side of New Building - Employees worked from mast climbing scaffolds, erected end to end along the building's east side, to install the brick facing on the building.  The western most plank, not nailed or otherwise restrained, used to bridge the outrigger platform level between the Premier mast climber and the adjacent Hydro Mobile mast climber, extended an inch or two over the outrigger support on the Hydro Mobile mast climber, making this plank susceptible to sliding off the Hydro Mobile's outrigger support and exposing employees to the hazard of falling 13 feet to the ground below, on or about October 6, 2020.  No abatement certification required.
Recent events (2)
  • — I (S) $2580
  • — Z (S) $3441

1926.451 C02 I

Other-than-serious 1 instance 2 exposed
Issued
Nov 4, 2020
Abate by
Dec 2, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.451(c)(2)(i): Footings were not level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement:  (a) East Side of New Building - Employees worked from mast climbing scaffolds, erected end to end along the building's east side, to install the brick facing on the building.  On the Premier mast climber, the front mud sill on the northern most tower/mast was uneven, sloping downward from south to north, on or about October 6, 2020.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Ralph E. Tolbert Masonry, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344961743.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.