NORFOLK, VA —
OSHA Inspection: MHI SHIP REPAIR AND SERVICES
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of MHI SHIP REPAIR AND SERVICES in 1215 WARRINGTON AVE USS NORMANDY CG-60, NORFOLK, VA 23507 (NAICS 336611). OSHA activity number 345210082.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MHI SHIP REPAIR AND SERVICES
- Site address
- 1215 WARRINGTON AVE USS NORMANDY CG-60
- City
- NORFOLK
- State
- VA
- ZIP
- 23507
- Mailing
- 543 EAST INDIAN RIVER ROAD, NORFOLK, VA 23523
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 336611
- Employees
- 350
- Ownership type
- A
Citations
4 citations on file for this inspection.
1915.116 B
- Issued
- May 13, 2021
- Abate by
- Jun 9, 2021
- Penalty
- Initial $13,653 · Current $9,557 Reduced
General-duty citation text
29 CFR 1915.116(b): Loads were not safely rigged before being moved: a) MHI, Normandy CG-60: On or about March 21, 2021, the Bolted Equipment Removal Plate was not rigged safely in that the knot used to tie the sling ends together separated causing the load to fall fracturing an employee's foot. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $9557.1
- — Z (S) $13653
1910.184 I01
- Issued
- May 13, 2021
- Abate by
- Jun 9, 2021
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.184(i)(1): Synthetic web sling(s) were not marked or coded to show rated capacities for each type of hitch and type of synthetic web material: a) MHI, Normandy CG-60: On or about March 21, 2021, the sling used to lift the Bolted Equipment Removal Plate was not marked or coded to show the rated capacity. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1915.152 B
- Issued
- May 13, 2021
- Abate by
- Jun 9, 2021
- Penalty
- Initial $13,653 · Current $9,557 Reduced
General-duty citation text
29 CFR 1915.152(b): The employer did not asses its work activity to determine whether there were hazards present, which necessitated the employee's use of personal protective equipment: a) MHI, Normandy CG-60: On or about March 21, 2021, a hazard assessment of the work activity was not conducted in that employees were left to design a method to lift a Bolted Equipment Removal Plate, as a result fell and fracture an employee's foot. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $9557.1
- — Z (S) $13653
1915.159 A09
- Issued
- May 13, 2021
- Abate by
- Jun 9, 2021
- Penalty
- Initial $9,753 · Current $7,802 Reduced
General-duty citation text
29 CFR 1915.159(a)(9): Anchorages were not capable of supporting at least 5,000 pounds (22.2 Kn) per employee attached: a) MHI, Normandy CG-60: On or about March 21, 2021, employees engaged in the removal and installation of Bolted Equipment Removal Plates attached their lanyard to a guardrail that was not capable of supporting at least 5000 pounds in that the guardrail was not anchored to the vessel structure thus exposed employee to an approximate 9 feet fall. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $7802.4
- — Z (S) $9753
More inspections in this industry (NAICS 336611)
More inspections in VA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345210082.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.