Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MHI SHIP REPAIR AND SERVICES

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of MHI SHIP REPAIR AND SERVICES in 1215 WARRINGTON AVE USS NORMANDY CG-60, NORFOLK, VA 23507 (NAICS 336611). OSHA activity number 345210082.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch MHI Ship Repair and Services — free Get an email when a new federal OSHA severe-injury report for MHI Ship Repair and Services is published. One employer, no account, unsubscribe in one click.
Site address
1215 WARRINGTON AVE USS NORMANDY CG-60
City
NORFOLK
State
VA
ZIP
23507
Mailing
543 EAST INDIAN RIVER ROAD, NORFOLK, VA 23523
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
336611
Employees
350
Ownership type
A

4 citations on file for this inspection.

1915.116 B

Serious Gravity 10 1 instance 35 exposed
Issued
May 13, 2021
Abate by
Jun 9, 2021
Penalty
Initial $13,653 · Current $9,557 Reduced
29 CFR  1915.116(b): Loads were not safely rigged before being moved:  a)	MHI, Normandy CG-60: On or about March 21, 2021, the Bolted Equipment Removal Plate was not rigged safely in that the knot used to tie the sling ends together separated causing the load to fall fracturing an employee's foot.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $9557.1
  • — Z (S) $13653

1910.184 I01

Serious Gravity 10 1 instance 35 exposed
Issued
May 13, 2021
Abate by
Jun 9, 2021
Penalty
Initial $0 · Current $0
29 CFR  1910.184(i)(1): Synthetic web sling(s) were not marked or coded to show rated capacities for each type of hitch and type of synthetic web material:  a)	MHI, Normandy CG-60: On or about March 21, 2021, the sling used to lift the Bolted Equipment Removal Plate was not marked or coded to show the rated capacity.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1915.152 B

Serious Gravity 10 1 instance 35 exposed
Issued
May 13, 2021
Abate by
Jun 9, 2021
Penalty
Initial $13,653 · Current $9,557 Reduced
29 CFR  1915.152(b): The employer did not asses its work activity to determine whether there were hazards present, which necessitated the employee's use of personal protective equipment:  a)	MHI, Normandy CG-60: On or about March 21, 2021, a hazard assessment of the work activity was not conducted in that employees were left to design a method to lift a Bolted Equipment Removal Plate, as a result fell and fracture an employee's foot.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $9557.1
  • — Z (S) $13653

1915.159 A09

Serious Gravity 5 1 instance 35 exposed
Issued
May 13, 2021
Abate by
Jun 9, 2021
Penalty
Initial $9,753 · Current $7,802 Reduced
29 CFR  1915.159(a)(9): Anchorages were not capable of supporting at least 5,000 pounds (22.2 Kn) per employee attached:  a)	MHI, Normandy CG-60: On or about March 21, 2021, employees engaged in the removal and installation of Bolted Equipment Removal Plates attached their lanyard to a guardrail that was not capable of supporting at least 5000 pounds in that the guardrail was not anchored to the vessel structure thus exposed employee to an approximate 9 feet fall.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $7802.4
  • — Z (S) $9753

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345210082.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.