WEST READING, PA —
OSHA Inspection: ALIAKSANDR KRASNOUSKI
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of ALIAKSANDR KRASNOUSKI in 701 READING AVENUE, WEST READING, PA 19611 (NAICS 237130). OSHA activity number 345294003.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ALIAKSANDR KRASNOUSKI
- Site address
- 701 READING AVENUE
- City
- WEST READING
- State
- PA
- ZIP
- 19611
- Mailing
- 10833 LOCKART ROAD SECOND FLOOR, PHILADELPHIA, PA 19116
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237130
- Employees
- 1
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.200 G01
- Issued
- May 13, 2021
- Abate by
- Jun 9, 2021
- Penalty
- Initial $2,926 · Current $2,926
General-duty citation text
29 CFR 1926.200(g)(1): Construction areas were not posted with legible traffic signs and protected by traffic control devices at points of hazards: (a) Parking Lot at Southwest Corner of Building - The employer used a JLG 1350SJP Ultra Boom aerial lift stationed in the parking lot as a means to provide an employee with access to and from the roof level. No traffic signs nor traffic control devices got conspicuously posted/installed to alert and channel approaching traffic to protect the aerial lift from getting struck by the vehicles traveling in the parking lot, on or about November 19, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $2926
1926.453 A02
- Issued
- May 13, 2021
- Abate by
- Jun 9, 2021
- Penalty
- Initial $2,926 · Current $2,926
General-duty citation text
29 CFR 1926.453(a)(2): Field modification of the aerial lift was not certified in writing by the manufacturer or by any other equivalent entity, such as a nationally recognized testing laboratory, to be in conformity with all applicable provisions of ANSI A92.2-1969: (a) Parking Lot at Southwest Corner of Building - The employer performed an unapproved field modification to the rented JLG 1350SJP Ultra Boom aerial lift, serial number 0300183075, by attaching a nylon sling to the underside of the lift's basket/platform in order to use the aerial lift to lower old telecommunication antennas removed from the building and to raise new telecommunication antennas for installation on the building, exposing an employee to hazards such as tipping and struck by, on or about November 19, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $2926
1926.501 B01
- Issued
- May 13, 2021
- Abate by
- Jun 9, 2021
- Penalty
- Initial $2,926 · Current $2,926
General-duty citation text
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems: (a) Northwest Corner of Roof of Two-Story Extension on Front of Building - An employee stood on the two-story extension's roof to install and integrate a rooftop telecommunications antennae attached to the exterior northwest corner wall of the two-story extension. The roof had a parapet wall that came up only to about mid-thigh level on the employee, and at times, the employee laid on top of the parapet wall to work. The employee did not have protection from falling to a lower level by a guardrail system, safety net system, or personal fall protection system, on or about November 19, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $2926
1926.502 D15
- Issued
- May 13, 2021
- Abate by
- Jun 9, 2021
- Penalty
- Initial $2,926 · Current $2,926
General-duty citation text
29 CFR 1926.502(d)(15): Anchorage points used for attachment of personal fall arrest equipment were not independent of any anchorage point being used to support or suspend platforms and capable of supporting at least 5,000 pounds (22.2 kN) per employee: (a) Southwest Side of Building - The employer and an employee rode in the basket of the JLG 1350SJP Ultra Boom aerial lift to come from the roof level down to ground level. Both attached the lanyards of their personal fall arrest systems to the same anchorage point within the aerial lift's basket, contrary to the JLG Operation and Safety Manual, which says to attach one lanyard to each lanyard anchorage point, exposing the employee to the hazard of falling to a lower level, on or about November 19, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $2926
1926.95 D01
- Issued
- May 13, 2021
- Abate by
- Jun 9, 2021
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.95(d)(1): The employer did not provide personal protective equipment, at no cost, to the employees: (a) Job Site - The employer did not pay for personal fall arrest equipment used by employees, who worked installing and integrating rooftop telecommunication antennas, six stories above the ground, on or about November 19, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (O) $0
More inspections in this industry (NAICS 237130)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345294003.