On , OSHA opened a complaint safety inspection of NIRAM, INC. in 390 N RIDGE RD., RYE BROOK, NY 10573 (NAICS 236220). OSHA activity number 345318000.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- NIRAM, INC.
- Site address
- 390 N RIDGE RD.
- City
- RYE BROOK
- State
- NY
- ZIP
- 10573
- Mailing
- 4 EAST FREDERICK PLACE, CEDAR KNOLLS, NJ 07927
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 20
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.50 G
- Issued
- Jun 14, 2021
- Penalty
- Initial $3,121 · Current $0 Reduced
General-duty citation text
29 CFR 1926.50(g):Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use: On or about May 19, 2021 Location: 4 East Frederick Place Cedar Knolls, NJ 07927 a) Eyewash station was not provided on construction site where two-Spec mix mixer are used for mixing spec-mix that has corrosive materials.
Recent events (2)
- — I (S) $0
- — Z (S) $3121
1926.150 C01 VIII
- Issued
- Jun 14, 2021
- Penalty
- Initial $3,121 · Current $2,125 Reduced
General-duty citation text
29 CFR 1926.150(c)(1)(viii): Portable fire extinguishers were not inspected periodically in accordance with maintenance and use of portable fire extinguishers, N.F.P.A. No. 10A-1970: On or about May 19, 2021 Location: 4 East Frederick Place Cedar Knolls, NJ 07927 a) Fire extinguisher located near spec-mix mixers was not properly tagged, and secured to wall exposing employees to fall hazards and fire hazards. b) Fire extinguishers located through out the building were not properly tagged, and secured to wall exposing employees to fall hazards and fire hazards.
Recent events (2)
- — I (O) $2125
- — Z (S) $3121
1926.153 K02
- Issued
- Jun 14, 2021
- Penalty
- Initial $3,121 · Current $2,125 Reduced
General-duty citation text
29 CFR 1926.153(k)(2): LP-Gas containers were not in a suitably ventilated enclosure or otherwise protected against tampering: On or about May 19, 2021 Location: 4 East Frederick Place Cedar Knolls, NJ 07927 a) Two LP-Gas containers near Spec-mixer were not properly secured in storage container after being used exposing employees to fire hazards.
Recent events (2)
- — I (S) $2125
- — Z (S) $3121
1926.451 E09 I
- Issued
- Jun 14, 2021
- Penalty
- Initial $3,901 · Current $0 Reduced
General-duty citation text
29 CFR 1926.451(e)(9)(i): The employer did not provide safe means of access for each employee erecting or dismantling a scaffold: On or about May 19, 2021 Location: 4 East Frederick Place Cedar Knolls, NJ 07927 a)Stairwell hand rail was not properly secured and had open end exposing employees to fall hazards and punctures.
Recent events (2)
- — I (S) $0
- — Z (S) $3901
1926.451 G04 I
- Issued
- Jun 14, 2021
- Penalty
- Initial $5,461 · Current $0 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: On or about May 19, 2021 Location: 4 East Frederick Place Cedar Knolls, NJ 07927 a) The right side of first, second, and third level of scaffold had missing mid rails exposing employees to a fall hazard.
Recent events (2)
- — I (S) $0
- — Z (S) $5461
1926.451 H01
- Issued
- Jun 14, 2021
- Penalty
- Initial $5,461 · Current $0 Reduced
General-duty citation text
29 CFR 1926.451(h)(1): Each employee on a scaffold was not provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects: On or about May 19, 2021 Location: 4 East Frederick Place Cedar Knolls, NJ 07927 a) On the first and second level of scaffold brick material was placed at edge of the working platform without having toe boards in place exposing employees working below to struck by hazards.
Recent events (2)
- — I (S) $0
- — Z (S) $5461
More inspections at Niram, INC.
View Niram, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345318000.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.