On , OSHA opened a referral safety inspection of ITW PERMATEX in 6875 PARKLAND BLVD, SOLON, OH 44139 (NAICS 325180). OSHA activity number 345353460.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ITW PERMATEX
- Site address
- 6875 PARKLAND BLVD
- City
- SOLON
- State
- OH
- ZIP
- 44139
- Mailing
- 6875 PARKLAND BLVD, SOLON, OH 44139
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325180
- Employees
- 70
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.147 C04 I
- Issued
- Nov 24, 2021
- Penalty
- Initial $8,778 · Current $4,389 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: On or about May 28, 2021, the employer did not ensure energy control procedures were utilized when an employee was clearing a jam on the Line 16, Alloyd blister pack machine (Model: 18SC1216, Ser#: 97605).
Recent events (2)
- — I (S) $4389
- — Z (S) $8778
1910.147 D
- Issued
- Nov 24, 2021
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): On or about May 28, 2021, the employer did not ensure energy control procedures were utilized when an employee was clearing a jam on the Line 16, Alloyd blister pack machine (Model: 18SC1216, Ser#: 97605. The employer failed to implement energy control application steps as the machine was not shut down or turned off to perform the servicing work [per the 1910.147(d)(2) requirements]. As a result, the remaining applicable energy control elements, involving machine isolation [(d)(3)], LOTO device application [(d)(4)], dissipation of residual energy [(d)(5)(i)], and verification of isolation [(d)(6)], were not implemented to protect employees from machine servicing hazards.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C06 I
- Issued
- Nov 24, 2021
- Abate by
- Jan 31, 2022
- Penalty
- Initial $8,778 · Current $4,389 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: On or about June 9, 2021, the employer did not ensure periodic inspections of energy control procedures were conducted annually, including a review of each authorized employee's responsibilities under the energy control procedures. Authorized employees are required to conduct and direct service/maintenance activities on the Alloyd Blister Pack Machine (Model 10SC1216) requiring them to perform lockout/tagout.
Recent events (2)
- — I (S) $4389
- — Z (S) $8778
1910.147 C07 I
- Issued
- Nov 24, 2021
- Abate by
- Jan 31, 2022
- Penalty
- Initial $8,778 · Current $4,389 Reduced
General-duty citation text
29 CFR 1910.147(c)(7)(i): The employer shall provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees. The training shall include the following: On or about May 28, 2021, the employer failed to provide training to ensure affected and authorized employees understood the purpose and function of the energy control program and employees had acquired the knowledge and skills required for the safe application, usage, and removal of energy controls. The employer engages in the service and maintenance activities on machinery and equipment including, but not limited to; the Alloyd Blister Pack Machine, Model 10SC1216.
Recent events (2)
- — I (S) $4389
- — Z (S) $8778
More inspections in this industry (NAICS 325180)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345353460.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.