Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: HALO CONSTRUCTION DBM, INC.

Unprogrammed Other inspection · Health discipline

On , OSHA opened an unprogrammed Other health inspection of HALO CONSTRUCTION DBM, INC. in 6300 N SHERIDAN RD., CHICAGO, IL 60660 (NAICS 236118). OSHA activity number 345464341.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Halo Construction DBM, INC. — free Get an email when a new federal OSHA severe-injury report for Halo Construction DBM, INC. is published. One employer, no account, unsubscribe in one click.
Site address
6300 N SHERIDAN RD.
City
CHICAGO
State
IL
ZIP
60660
Mailing
5901 N CICERO AVE, CHICAGO, IL 60646
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
4
Ownership type
A

4 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Jun 6, 2022
Abate by
Jul 11, 2022
Penalty
Initial $349 · Current $349
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:   HALO Construction DBM, Inc., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:   Citation Number            Item Number                    Abatement Date 01                                          1a                                          02/07/2022 01                                          1b                                          02/07/2022 01                                          02                                          02/07/2022   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $349

1926.1153 C01

Serious Gravity 5 1 instance 3 exposed
Issued
Jan 19, 2022
Abate by
Feb 7, 2022
Penalty
Initial $3,108 · Current $3,108

Hazardous substances 9000

29 CFR  1926.1153(c)(1): For each employee engaged in a task identified on Table 1, the employer did not fully and properly implement the engineering controls, work practices, and respiratory protection specified for the task on Table 1, unless the employer assesses and limits the exposure of the employee to respirable crystalline silica in accordance with paragraph (d) of this section.  a) HALO Construction DBM, Inc. located at 6300 N Sheridan Road, Chicago, IL 60660:  On  August 6, 2021, the employer did not fully and properly implement engineering controls and work practices, as specified in Table 1 when using a handheld gas powered saw, STIHL Model TS 420 , to remove mortar from bricks containing 6%  of crystalline silica (Quartz) without using a saw equipped with a commercially available integrated water delivery system that continuously feeds water to the blade.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $3108

1926.1153 D02 I

Serious Gravity 5 1 instance 3 exposed
Issued
Jan 19, 2022
Abate by
Feb 7, 2022
Penalty
Initial $0 · Current $0

Hazardous substances 9000

29 CFR  1926.1153(d)(2)(i): The employer did not assess the exposure of each employee who was or may reasonably be expected to be exposed to respirable crystalline silica at or above the action level in accordance with either the performance option in paragraph (d)(2)(ii) or the scheduled monitoring option in paragraph (d)(2)(iii) of this section:  a) HALO Construction DBM, Inc. located at 6300 N Sheridan Road, Chicago, IL 60660:  On August 6, 2021, the employer did not assess the employee's exposure to respirable crystalline silica when operating a handheld gas powered saw, STIHL Model TS 420 Cutquik, to remove mortar from bricks containing 6%  of crystalline silica (Quartz).   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.1153 G01

Serious Gravity 5 1 instance 3 exposed
Issued
Jan 19, 2022
Abate by
Feb 7, 2022
Penalty
Initial $3,108 · Current $3,108

Hazardous substances 9000

29 CFR  1926.1153(g)(1): The employer did not establish and implement a written exposure control plan:  a) HALO Construction DBM, Inc. located at 6300 N Sheridan Road, Chicago, IL 60660:  On  August 6, 2021, the employer did not establish and implement a site specific written exposure control plan that outlined at least the following elements: descriptions of the tasks that can expose employees to silica, descriptions of the work practices, respiratory protection, engineering controls, description of housekeeping measures, and if necessary, procedures to limit access to areas to reduce employee exposure to crystalline silica. Employee(s) were exposed to dust containing up to 6% crystalline silica (Quartz) when dry cutting mortar between bricks with a handheld gas powered saw (STIHL Model TS 420).   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $3108

View Halo Construction DBM, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345464341.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.