NORFOLK, VA —
OSHA Inspection: RQ CONSTRUCTION, LLC
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of RQ CONSTRUCTION, LLC in 9359 VIRGINIA AVE NORFOLK NAVAL STATION, NORFOLK, VA 23511 (NAICS 236220). OSHA activity number 345482012.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- RQ CONSTRUCTION, LLC
- Site address
- 9359 VIRGINIA AVE NORFOLK NAVAL STATION
- City
- NORFOLK
- State
- VA
- ZIP
- 23511
- Mailing
- 1620 FARADAY AVENUE, CARLSBAD, CA 92008
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 500
- Ownership type
- A
Citations
7 citations on file for this inspection.
1926.34 B
- Issued
- Oct 19, 2021
- Abate by
- Nov 15, 2021
- Penalty
- Initial $8,778 · Current $8,778
General-duty citation text
29 CFR 1926.34(b): Exits and access to exits were not marked by a readily visible sign: a) P-1120 Mariners Skills Training Center: On or about 08/16/2021, exit signs were not visible or marked throughout the building. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — R (O) $8778
- — C (S) $8778
- — Z (S) $8778
1926.34 C
- Issued
- Oct 19, 2021
- Abate by
- Nov 15, 2021
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.34(c): Means of egress was not continually maintained free of all obstructions or impediments to full instant use in the case of fire or other emergency: a) P-1120 Mariners Skills Training Center: On or about 08/16/2021, means of egress was not continually maintained free of all obstructions in that electrical conduits were installed on the floor of the main corridors thereby exposing personnel to a possible trip hazard: Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — R (O) $0
- — C (S) $0
- — Z (S) $0
1926.501 B03
- Issued
- Oct 19, 2021
- Abate by
- Nov 15, 2021
- Penalty
- Initial $8,778 · Current $8,778
General-duty citation text
29 CFR 1926.501(b)(3): Each employee in a hoist area was not protected from falling 6 feet (1.8m) or more to lower levels by guardrail systems or personal fall arrest systems: a) P-1120 Mariners Skills Training Center: On or about 08/16/2021, CSHO observed an employee pour piles of water from a hoist area approximately 20ft from the ground without fall protection. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — R (O) $8778
- — C (S) $8778
- — Z (S) $8778
1926.503 A02
- Issued
- Oct 19, 2021
- Abate by
- Nov 15, 2021
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.503(a)(2): The employer did not assure that each employee exposed to fall hazards was trained by a competent person qualified in the areas specified in 29 CFR 1926.503 (a)(2)(i) through (viii): a) P-1120 Mariners Skills Training Center: On or about 08/16/2021, an employee exposed to a fall hazard was not provide with fall protection training. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — R (O) $0
- — C (S) $0
- — Z (S) $0
1926.1051 A
- Issued
- Oct 19, 2021
- Abate by
- Nov 15, 2021
- Penalty
- Initial $5,266 · Current $5,266
General-duty citation text
29 CFR 1926.1051(a): Stairway(s) or ladder(s) were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, or no ramp, runway, sloped embankment, or personnel hoist was provided: a) P-1120 Mariners Skills Training Center: On or about 08/16/2021, accesses available to subcontractors' employees had a break in elevation of approximately 41 inches. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — R (O) $5266
- — C (S) $5266
- — Z (S) $5266
1926.150 C01 I
- Issued
- Oct 19, 2021
- Abate by
- Nov 15, 2021
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.150(c)(1)(i): A fire extinguisher, rated not less than 2A, was not provided for each 3,000 square feet of the protected building area, or major fraction thereof: a) P-1120 Mariners Skills Training Center: On or about 08/16/2021, a fire extinguisher was not provided for each 3000 feet of building in that sections E and F of the building did not contain a fire extinguisher. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — R (O) $0
- — C (O) $0
- — Z (O) $0
1926.150 C01 IV
- Issued
- Oct 19, 2021
- Abate by
- Nov 15, 2021
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.150(c)(1)(iv): There was not at least one fire extinguisher located adjacent to stairways on each floor of a multistory building: a) P-1120 Mariners Skills Training Center: On or about 08/16/2021, a fire extinguisher was not located adjacent to each enclosed level of stairway. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — R (O) $0
- — C (O) $0
- — Z (O) $0
More inspections at RQ Construction, LLC
View RQ Construction, LLC's full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in VA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345482012.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.