Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ARAYA CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ARAYA CONSTRUCTION, LLC in 3477 CRYSTAL LANE, LANCASTER, PA 17601 (NAICS 238160). OSHA activity number 345527758.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Araya Construction, LLC — free Get an email when a new federal OSHA severe-injury report for Araya Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
3477 CRYSTAL LANE
City
LANCASTER
State
PA
ZIP
17601
Mailing
46 TURPIN STREET, TRENTON, NJ 08611
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
7
Ownership type
A

4 citations on file for this inspection.

1926.501 B13

Serious Gravity 10 2 instances 5 exposed
Issued
Mar 2, 2022
Abate by
Mar 28, 2022
Penalty
Initial $4,351 · Current $4,351
29 CFR 1926.501(b)(13):  Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b):  a) 3477 Crystal Lane, Lancaster, PA, Worksite, House Roof - On or about September 10, 2021,  employees who were performing residential roofing work were exposed to a fall hazard of 17-feet and were not utilizing acceptable means or methods of fall protection.   b) 3477 Crystal Lane, Lancaster, PA, Worksite, Garage Roof - On or about September 10, 2021,  employees who were performing residential roofing work were exposed to a fall hazard of 8.75-feet and were not utilizing acceptable means or methods of fall protection.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $4351

1926.1053 B01

Serious Gravity 10 2 instances 5 exposed
Issued
Mar 2, 2022
Abate by
Mar 28, 2022
Penalty
Initial $4,351 · Current $4,351
29 CFR  1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed:  a.) 3477 Crystal Lane, Lancaster, PA, Worksite, House Roof - On or about September 10, 2021, employees engaged in roofing activities were exposed to a fall hazard while utilizing an extension ladder to access the roof that was only extended 1.5-feet above the roofline and was not otherwise secured.    b.) 3477 Crystal Lane, Lancaster, PA, Worksite, Garage Roof - On or about September 10, 2021, employees engaged in roofing activities were exposed to a fall hazard while utilizing an extension ladder to access the roof that was only extended 2.5-feet above the roofline and was not otherwise secured.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $4351

1926.102 A01

Serious Gravity 5 1 instance 5 exposed
Issued
Mar 2, 2022
Abate by
Mar 28, 2022
Penalty
Initial $3,729 · Current $3,729
29 CFR  1926.102(a)(1):The employer did not ensure that each affected employee used appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.  a.) 3477 Crystal Lane, Lancaster, PA, Worksite, Roof - On or about September 10, 2021,  employees who were engaged in residential roofing activities were using pneumatic nail guns without appropriate eye or face protection.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $3729

1926.150 A01

Other-than-serious 1 instance 7 exposed
Issued
Mar 2, 2022
Abate by
Mar 28, 2022
Penalty
Initial $0 · Current $0

Hazardous substances 1340

29 CFR  1926.150(a)(1): The employer did not develop and maintain a fire protection program to be followed throughout all phases of construction and demolition work, and/or did not provide for the firefighting equipment as specified in this subpart:  a.) 3477 Crystal Lane, Lancaster, PA, Worksite, Roof - On or about September 10, 2021, the employer did not have a fire protection plan to ensure fire extinguishers were on-site while employees were operating equipment including, but not limited to, a gasoline-powered air compressor.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345527758.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.