Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MLM DRYWALL INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MLM DRYWALL INC. in 1111 AVENUE U, BROOKLYN, NY 11223 (NAICS 238310). OSHA activity number 345600662.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch MLM Drywall INC. — free Get an email when a new federal OSHA severe-injury report for MLM Drywall INC. is published. One employer, no account, unsubscribe in one click.
Establishment
MLM DRYWALL INC.
Site address
1111 AVENUE U
City
BROOKLYN
State
NY
ZIP
11223
Mailing
169-05 UNION TURNPIKE, FLUSHING, NY 11366
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238310
Employees
4
Ownership type
A

7 citations on file for this inspection.

1910.134 C01

Serious Gravity 1 1 instance 3 exposed
Issued
Apr 21, 2022
Abate by
May 3, 2022
Penalty
Initial $1,865 · Current $1,865
29 CFR  1910.134(c)(1): A written respiratory protection program that included the provisions in 29 CFR 1910.134(c)(1)(i) - (ix) with worksite specific procedures was not established and implemented for required respirator use: (Construction Reference 1926.103)  Location: 1111 Avenue U, Brooklyn, NY 11223 On or about: October 25, 2021  (a) The employer did not ensure that a written respiratory protection program with worksite specific procedures were established and implemented for required respirator use; employees sanding USG joint compound required to wear respirators were not provided a written respiratory protection program.
Recent events (1)
  • — Z (S) $1865

1910.134 E01

Serious Gravity 1 1 instance 3 exposed
Issued
Apr 21, 2022
Abate by
May 3, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.134(e)(1):The employer did not provide a medical evaluation to determine the employee's ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace: (Construction Reference 1926.103)  Location: 1111 Avenue U, Brooklyn, NY 11223 On or about: October 25, 2021  (a) The employer did not provide medical evaluations to determine employees' ability to use a respirator; employees sanding USG joint compound were not provided medical evaluations prior to being required to wear a respirator.
Recent events (1)
  • — Z (S) $0

1910.134 F02

Serious Gravity 1 1 instance 3 exposed
Issued
Apr 21, 2022
Abate by
May 3, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.134(f)(2):Employee(s) using tight-fitting facepiece respirators were not fit tested prior to initial use of the respirator: (Construction Reference 1926.103)  Location: 1111 Avenue U, Brooklyn, NY 11223 On or about: October 25, 2021  (a) The employer did not ensure that employees using tight-fitting facepiece respirators were fit tested prior to initial use of the respirator; employees sanding USG joint compound were required to wear respirators prior to being provided fit-testing.
Recent events (1)
  • — Z (S) $0

1910.134 K

Serious Gravity 1 1 instance 3 exposed
Issued
Apr 21, 2022
Abate by
May 3, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.134(k):The employer did not provide comprehensive, understandable training which did not occur annually and/or more often if necessary:  (Construction Reference 1926.103)  Location: 1111 Avenue U, Brooklyn, NY 11223 On or about: October 25, 2021  (a) The employer did not provide comprehensive, understandable training on proper respirator use to employees sanding USG joint compound that were required to use a respirator.
Recent events (1)
  • — Z (S) $0

1910.1200 E01

Serious Gravity 1 1 instance 3 exposed
Issued
Apr 21, 2022
Abate by
May 3, 2022
Penalty
Initial $1,865 · Current $1,865
29 CFR  1910.1200(e)(1):Employer had not developed or implemented a written hazard communication program which at included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii): (Construction Reference: 1926.59)   Location: 1111 Avenue U, Brooklyn, NY 11223 On or about: October 25, 2021  (a) The employer did not develop a written hazard communication program for employees using hazardous chemicals including but not limited to USG joint compound containing limestone, talc, mica, perlite, and kaolin.
Recent events (1)
  • — Z (S) $1865

1910.1200 G08

Serious Gravity 1 1 instance 3 exposed
Issued
Apr 21, 2022
Abate by
May 3, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.1200(g)(8):  The employer did not maintain in the workplace copies of the required safety data sheets for each hazardous chemical, and did not ensure that they were readily accessible during each work  shift to employees when they were in their work area(s)  Location: 1111 Avenue U, Brooklyn, NY 11223 On or about: October 25, 2021  (a) The employer did not maintain and provide to employees copies of the required safety data sheets for employees using hazardous chemicals including but not limited to USG joint compound containing limestone, talc, mica, perlite, and kaolin.
Recent events (1)
  • — Z (S) $0

1910.1200 H01

Serious Gravity 1 1 instance 3 exposed
Issued
Apr 21, 2022
Abate by
May 3, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.1200(h)(1):Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59)  Location: 1111 Avenue U, Brooklyn, NY 11223 On or about: October 25, 2021  (a) The employer did not provide effective information and training to employees using hazardous chemicals including but not limited to USG joint compound containing limestone, talc, mica, perlite, and kaolin.
Recent events (1)
  • — Z (S) $0

View MLM Drywall INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345600662.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.