OSHA Inspection: S & Y NATURAL STONE

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of S & Y NATURAL STONE in 270 CLIFTON BOULEVARD, CLIFTON, NJ 07011 (NAICS 423320). OSHA activity number 345646749.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch S & Y Natural Stone — free Get an email when a new federal OSHA severe-injury report for S & Y Natural Stone is published. One employer, no account, unsubscribe in one click.
Establishment
S & Y NATURAL STONE
Site address
270 CLIFTON BOULEVARD
City
CLIFTON
State
NJ
ZIP
07011
Mailing
270 CLIFTON BOULEVARD, CLIFTON, NJ 07011
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
423320
Employees
5
Ownership type
A

6 citations on file for this inspection.

1910.37 A03

Serious Gravity 10 1 instance 5 exposed
Issued
May 12, 2022
Penalty
Initial $4,351 · Current $2,611 Reduced
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed:  a) Back of Warehouse: The Exit Door was not kept free and unobstructed, exit door was blocked by material, wood and boxes, on or about 11/18/21
Recent events (3)
  • — J (S) $2610.6
  • — C (S) $4351
  • — Z (S) $4351

1910.110 E04 III

Serious Gravity 5 1 instance 1 exposed
Issued
May 12, 2022
Penalty
Initial $3,729 · Current $2,237 Reduced
29 CFR 1910.110(e)(4)(iii): Permanent and removable fuel containers were not securely mounted to prevent jarring loose, slipping, or rotating:  a) Building exterior: Propane tank being used to fuel PIT was not secured in place by the index pin, on or about 11/18/21.
Recent events (3)
  • — J (S) $2237.4
  • — C (S) $3729
  • — Z (S) $3729

1910.178 L06

Serious Gravity 10 1 instance 1 exposed
Issued
May 12, 2022
Penalty
Initial $4,351 · Current $2,611 Reduced
29 CFR 1910.178(l)(6): The employer did not certify that each operator has been trained and evaluated as required by this paragraph (l):  a) Warehouse: The operator of a Propane fueled PIT had not been certified by the employer as trained, on or about 11/18/21.
Recent events (3)
  • — J (S) $2610.6
  • — C (S) $4351
  • — Z (S) $4351

1910.37 B04

Serious Gravity 5 1 instance 5 exposed
Issued
May 12, 2022
Abate by
Jun 30, 2022
Penalty
Initial $3,729 · Current $2,237 Reduced
29 CFR  1910.37(b)(4):When the direction of travel to the exit or exit discharge was not immediately apparent, signs were not posted along the exit access indicating the direction of travel to the nearest exit and exit discharge:  a) Warehouse, no exit signs posted:  Exits signs were not posted along the exit access indicating the directions of travel to the nearest exit and exit discharge, on or about 11/18/21.
Recent events (3)
  • — J (S) $2237.4
  • — C (S) $3729
  • — Z (S) $3729

1910.178 A06

Serious Gravity 5 1 instance 1 exposed
Issued
May 12, 2022
Abate by
Jun 30, 2022
Penalty
Initial $3,729 · Current $2,237 Reduced
29 CFR  1910.178(a)(6):The employer did not ensure that all name-plates and markings were in place and maintained in a legible condition:  a) Nissan Forklift: The employer did not ensure that all name-plates and markings were maintained in a legible condition, on or about 11/18/21.
Recent events (3)
  • — J (S) $2237.4
  • — C (S) $3729
  • — Z (S) $3729

1910.178 P01

Serious Gravity 10 1 instance 5 exposed
Issued
May 12, 2022
Abate by
Jun 8, 2022
Penalty
Initial $4,351 · Current $2,611 Reduced
29 CFR 1910.178(p)(1): Powered industrial truck(s) found to be in need of repair, defective, or in any way unsafe had not been  taken out of service until restored to safe operating condition(s):  a) Nissan Forklift: The propane tank being used to fuel PIT was secured in place by only one of the two original metal straps, the other stap was missing, on or about 11/18/21
Recent events (3)
  • — J (S) $2610.6
  • — C (S) $4351
  • — Z (S) $4351

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345646749.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.