Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MIGUEL DERAS

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MIGUEL DERAS in 1849 EVERGLADES DRIVE, FORNEY, TX 75126 (NAICS 238140). OSHA activity number 345726012.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Miguel Deras — free Get an email when a new federal OSHA severe-injury report for Miguel Deras is published. One employer, no account, unsubscribe in one click.
Establishment
MIGUEL DERAS
Site address
1849 EVERGLADES DRIVE
City
FORNEY
State
TX
ZIP
75126
Mailing
3442 CULVER STREET, DALLAS, TX 75223
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

5 citations on file for this inspection.

1926.501 B13

Serious Gravity 10 1 instance 3 exposed
Issued
May 9, 2022
Penalty
Initial $4,351 · Current $4,351
29 CFR  1926.501(b)(13):Each employee engaged in residential construction activities 6 feet (1.8 m)  or more above lower levels was not protected by guardrail systems, safety net systems, personal fall arrest systems, or an alternative fall protection measure under another provision of paragraph 1926.501(b), nor did the employer demonstrate that it is infeasible or creates a greater hazard to use these systems and develop and implement a fall protection plan which meets the requirements of paragraph (k) of section 1926.502:  (a)   This violation occurred on or about January 13, 2022, at a job site located at 1849 Everglades Drive, Forney, TX; where employees applying bricks to the outer walls of a new residential single family house while standing on top of the roof and were exposed fall hazards to the lower level.
Recent events (1)
  • — Z (S) $4351

1926.100 A

Serious Gravity 5 1 instance 3 exposed
Issued
Jan 26, 2022
Abate by
Feb 22, 2022
Penalty
Initial $3,729 · Current $3,729
29 CFR  1926.100(a):Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:  (a)	This violation occurred on or about January 13, 2022, at a job site located at 1849 Everglades Drive, Forney, TX; where employees applying bricks to a two story residential home and were exposed to head injuries where an overhead hazard exists.
Recent events (1)
  • — Z (S) $3729

1926.102 A01

Serious Gravity 5 1 instance 3 exposed
Issued
Jan 26, 2022
Abate by
Feb 22, 2022
Penalty
Initial $3,729 · Current $3,729
29 CFR  1926.102(a)(1):Eye and face protective equipment were not used when machines or operations presented potential eye or face injury:  (a)	This violation occurred on or about January 13, 2022, at a job site located at 1849 Everglades Drive, Forney, TX; where employees doing masonry work and cutting bricks were exposed to eye injuries by not wearing eye protection.
Recent events (1)
  • — Z (S) $3729

1926.451 B01

Serious Gravity 10 2 instances 3 exposed
Issued
Jan 26, 2022
Abate by
Feb 22, 2022
Penalty
Initial $4,351 · Current $4,351
29 CFR  1926.451(b)(1):Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports:    This violation occurred on or about January 13, 2022, at a job site located at 1849 Everglades Drive, Forney, TX; where employees were walking across a scaffold platform to access the roof.  The scaffold was not fully planked and employees were exposed to fall hazards:  (a)	First tier scaffold, three (3) planks (b)	Second tier scaffold, four (4)-planks
Recent events (1)
  • — Z (S) $4351

1926.1051 A

Serious Gravity 10 1 instance 3 exposed
Issued
Jan 26, 2022
Abate by
Feb 22, 2022
Penalty
Initial $4,351 · Current $4,351
29 CFR  1926.1051(a):Stairway(s) or ladder(s) were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, or no ramp, runway, sloped embankment, or personnel hoist was provided:  (a)	This violation occurred on or about January 13, 2022, at a job site located at 1849 Everglades Drive, Forney, TX; where employees climbed the frames of a scaffold system to reach the roof and were exposed to a fall hazard.
Recent events (1)
  • — Z (S) $4351

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345726012.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.