OSHA Inspection: NAVAL FACILITIES ENGINEERING COMMAND MID-ATLANTIC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of NAVAL FACILITIES ENGINEERING COMMAND MID-ATLANTIC in PORTSMOUTH NAVAL HOSPITAL BUILDING 273, PORTSMOUTH, VA 23708 (NAICS 561210). OSHA activity number 345776512.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Naval Facilities Engineering Command Mid-Atlantic — free Get an email when a new federal OSHA severe-injury report for Naval Facilities Engineering Command Mid-Atlantic is published. One employer, no account, unsubscribe in one click.
Site address
PORTSMOUTH NAVAL HOSPITAL BUILDING 273
City
PORTSMOUTH
State
VA
ZIP
23708
Mailing
9324 VIRGINIA AVE COMMANDING OFFICER, CAPTAIN GORDAN MEEK, NORFOLK, VA 23511
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
561210
Employees
41
Ownership type
D

3 citations on file for this inspection.

1910.147 C04 II B

Serious Gravity 10 1 instance 13 exposed
Issued
Mar 16, 2022
Abate by
Apr 20, 2022
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy:   a) Portsmouth Naval Hospital: On or about 02/09/2022, procedural steps were not clearly and specially outlined  to control the multiple potential energy sources needed to deenergized and restrained components of the HVAC unit prior to the conducting the monthly planned maintenance.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

1910.147 D05 I

Serious Gravity 10 1 instance 11 exposed
Issued
Mar 16, 2022
Abate by
Apr 11, 2022
Penalty
Initial $0 · Current $0
29 CFR 1910.147(d)(5)(i): All potentially hazardous stored or residual energy was not relieved, disconnected, restrained or otherwise rendered safe after the application of lockout or tagout devices to energy isolating devices:  a) Portsmouth Naval Hospital, On or about 02/05/2022, the fan that connect to the motor pulley by belts in both the supply and return air handlers were not restrained to prevent potential movement caused by kinetic energy, thus exposed an employee to a possible amputation hazard.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

1910.303 B07 I

Other-than-serious 1 instance 11 exposed
Issued
Mar 16, 2022
Abate by
Apr 11, 2022
Penalty
Initial $0 · Current $0
29 CFR 1910.303(b)(7)(i): Unused openings in boxes, raceways, auxiliary gutters, cabinets, equipment cases, or housings were not effectively closed to afford protection substantially equivalent to the wall of the equipment:  a)  Portsmouth Naval Hospital, Air Handlers: On or about 02/09/2022, the handles that protruded through the cabinets of supply unit (37.03) and return unit (37.01) were missing thereby created an opening in the cabinet.     Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (O) $0

View Naval Facilities Engineering Command Mid-Atlantic's full OSHA safety record →