Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: NAVILLUS/MLJ. A JOINT VENTURE

Unprogrammed Related inspection · Health discipline

On , OSHA opened an unprogrammed Related health inspection of NAVILLUS/MLJ. A JOINT VENTURE in 35 FRANKFORT STREET, NEW YORK, NY 10038 (NAICS 237310). OSHA activity number 345841043.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Navillus/Mlj. a Joint Venture — free Get an email when a new federal OSHA severe-injury report for Navillus/Mlj. a Joint Venture is published. One employer, no account, unsubscribe in one click.
Site address
35 FRANKFORT STREET
City
NEW YORK
State
NY
ZIP
10038
Mailing
1010 NORTHERN BLVD. STE 200, GREAT NECK, NY 11021
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237310
Employees
108
Ownership type
A

3 citations on file for this inspection.

1926.1203 H02 II A

Deleted Serious Gravity 1 1 instance 4 exposed
Issued
Jun 1, 2022
Abate by
Jul 20, 2022
Penalty
Initial $5,594 · Current $0 Reduced
29 CFR 1926.1203(h)(2)(ii)(A): The information received from the host employer was not provided by the controlling contractor to the entry employer;   (a) On or about 12/02/2021 at 35 Frankfort Street New York, NY 10038, the controlling contractor Navillus/MLJ. a Joint Venture failed to provide the information received from the host employer to employees of Environmental Planning and Management, Inc. who entered a confined space located at Arch Block E Span 15.  (b) On or about 12/02/2021 at 35 Frankfort Street New York, NY 10038, the controlling contractor Navillus/MLJ. a Joint Venture failed to provide the information received from the host employer to employees of Greenman-Pedersen, Inc. (GPI) who entered a confined space located at Arch Block E Span 15.  NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1,000 AS PER 29 CFR 1903.19.
Recent events (3)
  • — C (S) $5594
  • — F (S) $0
  • — Z (S) $5594

1926.1203 H02 II B

Deleted Serious Gravity 1 2 instances 4 exposed
Issued
Jun 1, 2022
Abate by
Jul 20, 2022
Penalty
Initial $0 · Current $0
29 CFR  1926.1203(h)(2)(ii)(B): The controlling contractor did not provide any additional information the host employer had about the subjects listed in paragraph (h)(1) of this section;  (a) On or about 12/02/2021 at 35 Frankfort Street New York, NY 10038, the controlling contractor Navillus/MLJ. a Joint Venture failed to provide additional information such as but not limited to potential permit required confined space (PRCS) hazards to employees of Environmental Planning and Management, Inc. who entered a confined space located at Arch Block E Span 15.  (b) On or about 12/02/2021 at 35 Frankfort Street New York, NY 10038, the controlling contractor Navillus/MLJ. a Joint Venture failed to provide additional information such as but not limited to potential permit required confined space (PRCS) hazards to employees of Greenman-Pedersen, Inc. (GPI) who entered a confined space located at Arch Block E Span 15.  NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1,000 AS PER 29 CFR 1903.19.
Recent events (3)
  • — C (S) $0
  • — F (S) $0
  • — Z (S) $0

1926.1203 H02 II C

Deleted Serious Gravity 1 2 instances 4 exposed
Issued
Jun 1, 2022
Abate by
Jul 20, 2022
Penalty
Initial $0 · Current $0
29 CFR  1926.1203(h)(2)(ii)(C): The controlling contractor did not provide the precautions that the host employer, controlling contractor, or other entry employers implemented for the protection of employees in the permit spaces to the entry employers.  (a) On or about 12/02/2021 at 35 Frankfort Street New York, NY 10038, the controlling contractor Navillus/MLJ. a Joint Venture failed to provide the permit required confined space (PRCS) precautions to employees of Environmental Planning and Management (EPM), Inc. who entered a confined space located at Arch Block E Span 15.  (b) On or about 12/02/2021 at 35 Frankfort Street New York, NY 10038, the controlling contractor Navillus/MLJ. a Joint Venture failed to provide the permit required confined space (PRCS) precautions to employees of Greenman-Pedersen, Inc. (GPI) who entered a confined space located at Arch Block E Span 15.  NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1,000 AS PER 29 CFR 1903.19.
Recent events (3)
  • — C (S) $0
  • — F (S) $0
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345841043.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.