BUFFALO, NY —
OSHA Inspection: NIEDAX MONOSYSTEMS, INC.
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of NIEDAX MONOSYSTEMS, INC. in 180 HOPKINS STREET, BUFFALO, NY 14220 (NAICS 332313). OSHA activity number 345857528.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- NIEDAX MONOSYSTEMS, INC.
- Site address
- 180 HOPKINS STREET
- City
- BUFFALO
- State
- NY
- ZIP
- 14220
- Mailing
- 180 HOPKINS STREET, BUFFALO, NY 14220
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332313
- Employees
- 86
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.147 C01
- Issued
- May 4, 2022
- Penalty
- Initial $6,164 · Current $6,164
General-duty citation text
29 CFR 1910.147(c)(1): The employer did not establish an energy control program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energizing, start up or release of stored energy could occur and cause injury, the machine or equipment would be isolated and rendered inoperable. a) On or about 03/25/2022; throughout establishment, an energy control program was not established that consists of specific energy control procedures, authorized employee training and periodic inspections to ensure employees perform energy control procedures before servicing or doing maintenance such as but not limited to, changing dies or doing inspections on mechanical power presses such as, but not limited to: US 75 press, Russell JJ press NO ABATEMENT CERTIFICATION REQUIRED
Recent events (1)
- — Z (S) $6164
1910.147 C06 I
- Issued
- May 4, 2022
- Abate by
- May 26, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) On or about 03/25/2022, throughout establishment, employer did not conduct periodic inspections of the Lockout/Tagout procedures for employees that perform servicing/maintenance activities such as, but not limited to: changing dies or performing inspections on power presses. ABATEMENT CERTIFICATION REQUIRED
Recent events (1)
- — Z (S) $0
1910.147 C07 IV
- Issued
- May 4, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(7)(iv):The employer did not certify that employee training had been accomplished and kept up to date: a) On or about 03/25/2022; throughout establishment, when employees had lockout/Tagout authorized employee training, the employer did not certify that employee training had been accomplished and kept up to date. NO ABATEMENT CERTIFICATION REQUIRED
Recent events (1)
- — Z (O) $0
More inspections at Niedax Monosystems, INC.
View Niedax Monosystems, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 332313)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345857528.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.