HARRISBURG, PA —
OSHA Inspection: R III CONSTRUCTION INCORPORATED
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of R III CONSTRUCTION INCORPORATED in 643 SENECA STREET, HARRISBURG, PA 17110 (NAICS 237110). OSHA activity number 345953467.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- R III CONSTRUCTION INCORPORATED
- Site address
- 643 SENECA STREET
- City
- HARRISBURG
- State
- PA
- ZIP
- 17110
- Mailing
- 600 CREAMERY ROAD, NAZARETH, PA 18064
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237110
- Employees
- 5
- Ownership type
- A
Citations
7 citations on file for this inspection.
1926.52 D01
- Issued
- Aug 24, 2022
- Abate by
- Oct 14, 2022
- Penalty
- Initial $2,735 · Current $0 Reduced
General-duty citation text
29 CFR 1926.52(d)(1): In all cases where the sound levels exceeded the values shown in Table D-2 of 29 CFR 1926.52, a continuing, effective hearing conservation program was not administered: a. 643 Seneca Street - On or about May 12, 2022, employees were exposed to hazardous noise while working inside a build a box trench shielding device. The employees were operating jackhammer/air hammers to break up concrete that encapsulated the sewer pipe. The employees were not wearing hearing protection and no sampling had been done to determine the need for hearing conservation or protection. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (S) $2735
1926.404 F06
- Issued
- Aug 24, 2022
- Penalty
- Initial $3,419 · Current $2,250 Reduced
General-duty citation text
29 CFR 1926.404(f)(6):The path to ground from circuits, equipment, or enclosures was not permanent and continuous: a. 643 Seneca Street - On or about May 12, 2022, the employees were exposed to an electrical hazard from the use of an ungrounded extension cord that was plugged into a portable generator. Corrected During Inspection - No Abatement Required
Recent events (2)
- — I (S) $2250
- — Z (S) $3419
1926.405 G02 IV
- Issued
- Aug 24, 2022
- Abate by
- Oct 14, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws: a. 643 Seneca Street - On or about May 12, 2022, the employees were exposed to an electrical hazard from the use of an electric jack hammer that was not provided strain relief at the plug, which was then plugged into an extension cord that was not grounded. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.651 B04
- Issued
- Aug 24, 2022
- Abate by
- Oct 14, 2022
- Penalty
- Initial $3,419 · Current $2,250 Reduced
General-duty citation text
29 CFR 1926.651(b)(4):While the excavation was opened, underground installations were not protected, supported or removed as necessary to safeguard employees: a. 643 Seneca Street - On or about May 12, 2022, employees were working in a trench where underground utilities had been disrupted and water line had been damaged resulting in a steady trickle of water into the trench, which posed a risk of further deterioration or the trench walls and a cave in struck by hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2250
- — Z (S) $3419
1926.651 C02
- Issued
- Aug 24, 2022
- Abate by
- Oct 14, 2022
- Penalty
- Initial $3,419 · Current $2,250 Reduced
General-duty citation text
29 CFR 1926.651(c)(2):A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees: a. Trench Box - On or about May 12, 2022, employees working inside a trench were not provided with a means of safe egress from a trench approximately 10 feet deep, exposing employees to a caught in hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2250
- — Z (S) $3419
1926.651 K01
- Issued
- Aug 24, 2022
- Abate by
- Oct 14, 2022
- Penalty
- Initial $3,419 · Current $2,250 Reduced
General-duty citation text
29 CFR 1926.651(k)(1):An inspection of the excavations, the adjacent areas, and protective systems was not conducted by the competent person prior to the start of work and as needed throughout the shift: a. 643 Seneca Street - On or about May 12, 2022, the employees were exposed to a caught in hazard from a trench box that was installed and being utilized without the inspection of a competent person. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2250
- — Z (S) $3419
1926.652 C03 III
- Issued
- Aug 24, 2022
- Abate by
- Oct 14, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.652(c)(3)(iii):At least one copy of the tabulated data, which identifies the registered professional engineer who approved the data, was not maintained at the jobsite during construction of the protective system: a. 643 Seneca Street - On or about May 12, 2022, the employer built a 6'x4' modular build a box shield without the presence of the tabulated data during the construction of the protective system, exposing employees to caught in and struck by hazards related to engulfment. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at R III Construction Incorporated
View R III Construction Incorporated's full OSHA safety record →
More inspections in this industry (NAICS 237110)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345953467.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.