WASHINGTON, DC —
OSHA Inspection: ACTUAL CONSTRUCTION LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ACTUAL CONSTRUCTION LLC in 4826 CHESAPEAKE STREET NW, WASHINGTON, DC 20016 (NAICS 238130). OSHA activity number 346010721.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ACTUAL CONSTRUCTION LLC
- Site address
- 4826 CHESAPEAKE STREET NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20016
- Mailing
- 7304 RIGGS RD, HYATTSVILLE, MD 20783
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 4
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.451 B01
- Issued
- Nov 30, 2022
- Abate by
- Dec 8, 2022
- Penalty
- Initial $4,351 · Current $4,351
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii). a) On or about June 9, 2022: Westside of the building; the pump-jack scaffold used in the installation of the windows was not fully planked exposing the employees to an estimated 15-20 foot fall. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4351
1926.451 F07
- Issued
- Nov 30, 2022
- Abate by
- Dec 8, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person. a) On or about June 9, 2022: Westside of the building; the lack of a competent person to erect the scaffold exposed the employees to hazards such as the displacement of the legs that were not secured and employees working on the platform without fall protection. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
1926.451 G01 VII
- Issued
- Nov 30, 2022
- Abate by
- Dec 8, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. a) On or about June 9, 2022: Westside of the building; Employees, while working on a pump-jack scaffold, were not wearing proper fall protection exposing them to an estimated 15-20-foot fall while installing windows. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
1926.452 J02
- Issued
- Nov 30, 2022
- Abate by
- Dec 8, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. a) On or about June 9, 2022: Westside of the building; Employees were exposed to an estimated 15-20-foot fall due to not installing the triangular bracing at the bottom of the poles to prevent displacement while working on the pump-jack scaffold. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
More inspections in this industry (NAICS 238130)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346010721.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.