FORT CAMPBELL, KY ·
OSHA Inspection: SKYLER DESIGN BUILD
Programmed Related inspection · Safety discipline
At a glance
On , OSHA opened a programmed Related safety inspection of SKYLER DESIGN BUILD in BLDG 3713 1ST BCT VOLAR BARRACKS, FORT CAMPBELL, KY 42223 (NAICS 236220). OSHA activity number 346246622.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SKYLER DESIGN BUILD
- Site address
- BLDG 3713 1ST BCT VOLAR BARRACKS
- City
- FORT CAMPBELL
- State
- KY
- ZIP
- 42223
- Mailing
- 13201 NORTHWEST FREEWAY, HOUSTON, TX 77040
What kind of inspection was it?
- Inspection type
- Programmed Related (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 21
- Ownership type
- Private (A)
Citations
3 citations on file for this inspection.
1910.305 A02 X
- Issued
- Jan 5, 2023
- Penalty
- Initial $465 · Current $465
General-duty citation text
29 CFR 1910.305(a)(2)(x):29 CFR 1910.305(a)(2)(x): Flexible cords and cables were not protected from accidental damage, as might be caused, for example, by sharp corners, projections, and doorways or other pinch points: (a) Barracks Building - 2nd floor, common room to closet: On or about 9/26/2022, and at times prior, the employer exposed 21 employees to possible electrocution,
Recent events (1)
- · Z (O) $465
1926.416 A01
- Issued
- Jan 5, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: (a) On all floors and at all unfinished electrical outlets: On or about 26 September, 2022, and at times prior, the employer exposed employees to electrical shock and burns from unfinished electrical outlets, in that the circuit was not de-energized prior to employees working with, or in proximity to, the outlets.
Recent events (1)
- · Z (O) $0
1926.416 A03
- Issued
- Jan 5, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.416(a)(3):Before work began, the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into physical or electrical contact with the electric power circuit. (a) All floors and rooms throughout the building: On or about 26 September, 2022, and at times prior, the employer exposed employees to electrical shock or burns, in that they did not inspect the circuit prior to work beginning to ensure that the circuit was not energized.
Recent events (1)
- · Z (O) $0
More inspections at Skyler Design Build
View Skyler Design Build's full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in KY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 346246622.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.