GROTON, CT —
OSHA Inspection: D.S.O. MECHANICAL CORPORATION
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of D.S.O. MECHANICAL CORPORATION in 63 BRANFORD AVENUE, GROTON, CT 06340 (NAICS 238220). OSHA activity number 346265614.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- D.S.O. MECHANICAL CORPORATION
- Site address
- 63 BRANFORD AVENUE
- City
- GROTON
- State
- CT
- ZIP
- 06340
- Mailing
- 62 SPRING HILL ROAD, TRUMBULL, CT 06611
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238220
- Employees
- 4
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.1101 F02 I
- Issued
- Apr 3, 2023
- Abate by
- May 18, 2023
- Penalty
- Initial $7,813 · Current $0 Reduced
9020
General-duty citation text
29 CFR 1926.1101(f)(2)(i): The employer with a work operation covered by the asbestos standard did not ensure that a "competent person" conducted an exposure assessment immediately before or at the initiation of the operation to ascertain expected exposures during that operation or workplace: Branford Manor Apartments - Building 22: On or about October 06, 2022, the employer did not ensure that a work operation covered by the asbestos standard was monitored by a competent person ahead of, or at the initiation of, a Class 1 asbestos job. Employees were exposed to inhalation hazards when asbestos-containing material (ACM) and/or presumed asbestos containing material (PACM) was disturbed during the replacement of thermal system insulated (TSI) sheathed pipes located in the crawl space of an apartment building that was constructed in 1972.
Recent events (2)
- — I (S) $0
- — Z (S) $7813
1926.1101 O01
- Issued
- Apr 3, 2023
- Abate by
- May 18, 2023
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1926.1101(o)(1): General. On all construction worksites covered by this standard, the employer shall designate a competent person, having the qualifications and authorities for ensuring worker safety and health required by Subpart C, General Safety and Health Provisions for Construction (29 CFR 1926.20 through 1926.32). (A) The employer did not designate a competent person to ensure worker safety and health as required. Note: 29 CFR 1926.1101(o)(2) Required Inspections by the Competent Person. Section 1926.20(b)(2) which requires health and safety prevention programs to provide for frequent and regular inspections of the job sites, materials, and equipment to be made by competent persons, is incorporated. Branford Manor Apartments - Building 22: On or about October 06, 2022, the employer did not designate a competent person to ensure worker safety and health as required for a Class 1 asbestos job. Employees were exposed to inhalation hazards when asbestos-containing material (ACM) and/or presumed asbestos containing material (PACM) was disturbed during the replacement of thermal system insulated (TSI) sheathed pipes located in the crawl space of an apartment building that was constructed in 1972.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 H02 I
- Issued
- Apr 3, 2023
- Abate by
- May 18, 2023
- Penalty
- Initial $7,813 · Current $0 Reduced
9020
General-duty citation text
29 CFR 1926.1101(h)(2)(i):The employer failed to implement a respiratory protection program in accordance with 29 CFR 1910.134(b) through (d) [except (d)(1)(iii)], and (f) through (m), which covers each employee required by 29 CFR 1926.1101 to use a respirator: Branford Manor Apartments: On or about October 06, 2022, the employer failed to implement a respiratory protection program in accordance with 29 CFR 1910.134(b) through (d) when supplied air respirators (SARs) or powered air-purifying respirators (PAPRs) were necessary while performing Class 1 asbestos work without a negative exposure assessment (NEA).
Recent events (2)
- — I (S) $0
- — Z (S) $7813
1926.1101 H03 I A
- Issued
- Apr 3, 2023
- Abate by
- May 18, 2023
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1926.1101(h)(3)(i)(A):The employer selected or used filtering facepiece respirator against asbestos fibers: 63 Branford Manor Apartments - Building 22: On or about October 06, 2022, the employer provided employees with filtering facepiece respirators for use against asbestos fibers rather than the appropriate supplied air respirators (SARs) or powered air-purifying respirators (PAPRs) necessary for Class 1 asbestos work that was performed without a negative exposure assessment.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 K03 I
- Issued
- Apr 3, 2023
- Abate by
- May 18, 2023
- Penalty
- Initial $7,813 · Current $0 Reduced
9020
General-duty citation text
29 CFR 1926.1101(k)(3)(i): Before the employer permitted its own employees to perform work subject to this standard in areas containing asbestos-containing material (ACM) and presumed asbestos-containing material (PACM), the employer did not identify the presence, location and quantity of asbestos containing material and/or presumed asbestos containing material therein pursuant to 29 CFR 1926.1101(k)(1): Branford Manor Apartments - Building 22: On or about October 06, 2022, the employer failed to identify the presence, location, and quantity of asbestos containing material (ACM) and/or presumed asbestos containing material (PACM) before employees were tasked to replace pipes with thermal system insulation (TSI) sheathing that was located in the crawlspace of an apartment building constructed in 1972.
Recent events (2)
- — I (S) $0
- — Z (S) $7813
1926.1101 K09 I
- Issued
- Apr 3, 2023
- Abate by
- May 18, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(k)(9)(i):The employer did not institute, at no cost to employees, a training program for each employee who was likely to be exposed in excess of the permissible exposure limit (PEL) and for each employee who performed Class I through IV asbestos operations: Branford Manor Apartments - Building 22: On or about October 06, 2022, the employer failed to institute a training program when employees were likely exposed to asbestos in excess of the PEL during Class 1 work where pipes with thermal system insulation (TSI) sheathing was replaced in the crawlspace of an apartment building that was constructed in 1972.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at D.S.O. Mechanical Corporation
View D.S.O. Mechanical Corporation's full OSHA safety record →
More inspections in this industry (NAICS 238220)
More inspections in CT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346265614.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.