NORTHLAKE, TX —
OSHA Inspection: MIRA MARIO RIVAS
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MIRA MARIO RIVAS in 2205 17TH STREET, NORTHLAKE, TX 76226 (NAICS 238140). OSHA activity number 346286289.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MIRA MARIO RIVAS
- Site address
- 2205 17TH STREET
- City
- NORTHLAKE
- State
- TX
- ZIP
- 76226
- Mailing
- 7017 NORMA STREET, FORT WORTH, TX 76112
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 9
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.20 B02
- Issued
- Oct 19, 2022
- Abate by
- Dec 1, 2022
- Penalty
- Initial $3,729 · Current $3,729
General-duty citation text
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s). Or about October 17, 2022 and times prior there to, the employer did not perform frequent and periodic site inspections to protect employees from including, but not limited to, fall hazards and stuck by hazards
Recent events (2)
- — I (S) $3729
- — Z (S) $3729
1926.102 A01
- Issued
- Oct 19, 2022
- Abate by
- Nov 17, 2022
- Penalty
- Initial $3,729 · Current $0 Reduced
General-duty citation text
29 CFR 1926.102(a)(1):The employer did not ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation. On or about October 17, 2022 and times prior there to, employees breaking bricks with hand tools and utilizing a saw to dry cut bricks were not protected from flying debris with eye protection during the following instances: a) Employee dry cutting bricks; b) Employees working from scaffold and breaking bricks with hand tools.
Recent events (2)
- — I (S) $0
- — Z (S) $3729
1926.451 B01
- Issued
- Oct 19, 2022
- Abate by
- Nov 17, 2022
- Penalty
- Initial $3,729 · Current $0 Reduced
General-duty citation text
29 CFR 1926.451(b)(1):Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii). On or about October 17, 2022 and times prior there to, the scaffolding levels were not fully planked from upright to upright to create a solid work platform.
Recent events (2)
- — I (S) $0
- — Z (S) $3729
1926.451 C02
- Issued
- Oct 19, 2022
- Abate by
- Nov 17, 2022
- Penalty
- Initial $3,729 · Current $0 Reduced
General-duty citation text
29 CFR 1926.451(c)(2):Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation. On or about October 17, 2022 and times prior there to, the two tiered scaffold system support poles were not bearing on base plates, mud sills or firm foundation while occupied by employees.
Recent events (2)
- — I (S) $0
- — Z (S) $3729
1926.451 E01
- Issued
- Oct 19, 2022
- Abate by
- Nov 17, 2022
- Penalty
- Initial $3,729 · Current $0 Reduced
General-duty citation text
29 CFR 1926.451(e)(1):When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. On or about October 17, 2022 and times prior there to, employees were not provided with a safe means egress to and from the scaffold via a ladder or other approved means. Employees accessed the scaffold via end rails and cross braces.
Recent events (2)
- — I (S) $0
- — Z (S) $3729
More inspections at Mira Mario Rivas
View Mira Mario Rivas's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346286289.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.