OSHA Inspection: MANUEL MERCADO

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MANUEL MERCADO in 2205 17TH STREET, NORTHLAKE, TX 76226 (NAICS 238130). OSHA activity number 346313422.

Watch Manuel Mercado — free Get an email when a new federal OSHA severe-injury report for Manuel Mercado is published. One employer, no account, unsubscribe in one click.
Establishment
MANUEL MERCADO
Site address
2205 17TH STREET
City
NORTHLAKE
State
TX
ZIP
76226
Mailing
5311 UMBRELLA PINE, ARLINGTON, TX 76018
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
5
Ownership type
A

5 citations on file for this inspection.

1926.100 A

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $4351.00 · Current $1740.00 Reduced
29 CFR  1926.100(a):Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets.   Or about October 17, 2022 and times prior there to, employees working on and near the two tiered scaffolding system were not protected from overhead hazards caused by masonry related work and stacked bricks via protective helmets.
Recent events (2)
  • — I (S) $1740.4
  • — Z (S) $4351

1926.102 A01

Serious Gravity 10 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $4351.00 · Current $1740.00 Reduced
29 CFR  1926.102(a)(1):The employer did not ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.  On or about October 17, 2022 and times prior there to, employees breaking bricks with hand tools and utilizing a saw to dry cut bricks were not protected from flying debris with eye protection during the following instances:  a) Employee dry cutting bricks; b) Employees working from scaffold and breaking bricks with hand tools.
Recent events (2)
  • — I (S) $1740.4
  • — Z (S) $4351

1926.451 B01

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $4351.00 · Current $1740.00 Reduced
29 CFR  1926.451(b)(1):Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii).  On or about October 17, 2022 and times prior there to, the scaffolding levels were not fully planked from upright to upright to create a solid work platform.
Recent events (2)
  • — I (S) $1740.4
  • — Z (S) $4351

1926.451 C02

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $4351.00 · Current $1740.00 Reduced
29 CFR  1926.451(c)(2):Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation.  On or about October 17, 2022 and times prior there to, the two tiered scaffold system support poles were not bearing on base plates, mud sills or firm foundation while occupied by employees.
Recent events (2)
  • — I (S) $1740.4
  • — Z (S) $4351

1926.451 E01

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $4351.00 · Current $1740.00 Reduced
29 CFR  1926.451(e)(1):When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access.  On or about October 17, 2022 and times prior there to, employees were not provided with a safe means egress to and from the scaffold via a ladder or other approved means. Employees accessed the scaffold via end rails and cross braces.
Recent events (2)
  • — I (S) $1740.4
  • — Z (S) $4351

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346313422.