SHREWSBURY, MA —
OSHA Inspection: LUIS PINAL
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of LUIS PINAL in 43 N. QUISIGMOND AVE, SHREWSBURY, MA 01545 (NAICS 236118). OSHA activity number 346321904.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- LUIS PINAL
- Site address
- 43 N. QUISIGMOND AVE
- City
- SHREWSBURY
- State
- MA
- ZIP
- 01545
- Mailing
- 70 S BOW ST, MILFORD, MA 01757
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236118
- Employees
- 4
- Ownership type
- A
Citations
8 citations on file for this inspection.
1903.19 C01
- Issued
- Jul 11, 2023
- Abate by
- Aug 11, 2023
- Penalty
- Initial $376 · Current $376
General-duty citation text
29 CFR 1903.19 (c) (1)The employer had not certified to OSHA (the Agency) within 10 calendar days after the abatement date that each cited violation has been abated: As of April 12, 2023, the employer had not provided abatement certification for Citation 1 items 1, 2a, 3, 4a,and 4b, Inspection number 1632190, which was issued on December 29, 2022, and was due on January 26, 2023, with respect to a work location at 43 N Quisigmond Ave., Shrewsbury, MA.
Recent events (1)
- — Z (O) $376
1903.19 D01
- Issued
- Jul 11, 2023
- Abate by
- Aug 11, 2023
- Penalty
- Initial $376 · Current $376
General-duty citation text
29 CFR 1903.19(d)(1): The employer did not submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required: As of April 12, 2023, the employer had not provided abatement for the violations contained in inspection 1632190, which was issued on December 29, 2022 and has a final order date of February 8, 2023 with respect to violations at a located at 43 N Quisigmond Ave., Shrewsbury, MA.
Recent events (1)
- — Z (O) $376
1926.502 D06
- Issued
- Dec 29, 2022
- Abate by
- Jan 26, 2023
- Penalty
- Initial $3,108 · Current $1,554 Reduced
General-duty citation text
29 CFR 1926.502(d)(6): The snaphook was not a locking type and/or designed for the following connections as it was engaged to a d-ring to which another snaphook and/or other connector was attached: 43 N. Quigismond Ave., Shrewsbury, MA: On or about November 2, 2022, two employees were observed using non locking type connections to the harness D rings as part of their fall restraint system, more than 20 feet above the ground below. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19 (d) (1).
Recent events (2)
- — I (S) $1554
- — Z (S) $3108
1926.1053 B04
- Issued
- Dec 29, 2022
- Abate by
- Jan 26, 2023
- Penalty
- Initial $2,486 · Current $1,243 Reduced
General-duty citation text
29 CFR 1926.1053(b)(4):Ladders were not used only for the purpose for which they were designed: 43 N. Quigismond Ave., Shrewsbury, MA: On or about November 2, 2022, two employees were observed using a section of ladder not designed to be used by itself to reach their roof top work location at this residence.
Recent events (2)
- — I (S) $1243
- — Z (S) $2486
1926.1053 B01
- Issued
- Dec 29, 2022
- Abate by
- Jan 26, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1053(b)(1): When portable ladders were used for access to an upper landing surface, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access: 43 N. Quisigmond Ave., Shrewsbury, MA: On or about November 2, 2022, two employees were observed using a portable aluminum extension ladder to reach their roof top work location which did not extend 3 feet past that upper landing surface, exposing the employees to fall from height hazards to the asphalt below.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.502 D15
- Issued
- Dec 29, 2022
- Abate by
- Jan 26, 2023
- Penalty
- Initial $3,108 · Current $1,554 Reduced
General-duty citation text
29 CFR 1926.502(d)(15):Anchorages used for attachment of personal fall arrest were not capable of supporting at least 5,000 pounds (22.2 kN) per employee attached: 43 N. Quigismond Ave., Shrewsbury, MA: On or about November 2, 2022, the hinge style roof anchors the employees were using as their anchorage point were not properly installed, and thus incapable of supporting the required weight per employee attached. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19 (d) (1).
Recent events (2)
- — I (S) $1554
- — Z (S) $3108
1926.503 A01
- Issued
- Dec 29, 2022
- Abate by
- Jan 26, 2023
- Penalty
- Initial $3,108 · Current $1,554 Reduced
General-duty citation text
29 CFR 1926.503(a)(1):The employer did not provide a training program for each employee who might be exposed to fall hazards: 43 N. Quigismond Ave., Shrewsbury, MA: On or about November 2, 2022 employees were exposed to fall hazards as part of their assigned duties and the employer had not trained them prior to exposure to these hazards in topics such as but not limited to recognition of fall hazards, dangers of fall hazards and procedures each employee must take to prevent or minimize risk of such exposures. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19 (d) (1).
Recent events (2)
- — I (S) $1554
- — Z (S) $3108
1926.503 B01
- Issued
- Dec 29, 2022
- Abate by
- Jan 26, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.503(b)(1):The employer did not verify compliance with paragraph (a) of this section by preparing a written certification record: 43 N. Quigismond Ave., Shrewsbury, MA: On or about November 2, 2022: The employer had not prepared a written certification record of fall protection training which included the name or other identity of the person trained, the signature of the person trained, date(s) the training was completed and the signature of the person who conducted the training. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19 (d) (1).
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 236118)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346321904.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.