OSHA Inspection: G & R EXCAVATING AND DEMOLITION, INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of G & R EXCAVATING AND DEMOLITION, INC. in 600 PENN STREET BLAIR HOUSE APARTMENTS, HUNTINGDON, PA 16652 (NAICS 238910). OSHA activity number 346431711.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch G & R Excavating and Demolition, INC. — free Get an email when a new federal OSHA severe-injury report for G & R Excavating and Demolition, INC. is published. One employer, no account, unsubscribe in one click.
Site address
600 PENN STREET BLAIR HOUSE APARTMENTS
City
HUNTINGDON
State
PA
ZIP
16652
Mailing
900 PENNSYLVANIA AVENUE, TYRONE, PA 16686
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238910
Employees
7
Ownership type
A

9 citations on file for this inspection.

1926.251 C05

Other-than-serious Gravity 5 1 instance 5 exposed
Issued
Jul 5, 2023
Abate by
Jul 24, 2023
Penalty
Initial $7,813 · Current $6,500 Reduced
29 CFR  1926.251(c)(5):U-bolt wire rope clip(s) used to form eyes did not conform to Table H-20 to determine number and spacing of clip(s):  (a) 600 Penn Street, Huntingdon PA, Blair House Apartments demolition site - On or about January 20, 2023 the employer used  7/8 inch steel cable with loops which were secured using two 1 1/4 inch Crosby Clips.  The employer did not follow Table H-20 to determine the appropriate number and spacing of clips when fastening the Crosby Clips to the  steel cable.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $6500
  • — Z (S) $7813

1926.251 C05 I

Deleted Serious Gravity 5 1 instance 5 exposed
Issued
Jul 5, 2023
Abate by
Jul 24, 2023
Penalty
Initial $0 · Current $0
29 CFR  1926.251(c)(5)(i):The U section of U-bolt wire rope clip(s) used to form eyes was not in contact with the dead end of the rope:  (a) 600 Penn Street, Huntingdon PA, Blair House Apartments demolition site - On or about January 20, 2023 the employer used two (2) joined 7/8 inch steel cables while conducting demolition which had at least two 1 1/4 inch Crosby Clips which did not have the U section of the U-bolt in contact with the dead end of the rope.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.21 B02

Deleted Serious Gravity 5 1 instance 5 exposed
Issued
Jul 5, 2023
Abate by
Jul 24, 2023
Penalty
Initial $0 · Current $0
29 CFR  1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury:   (a) 600 Penn Street, Huntingdon PA, Blair House Apartments demolition site - On or about January 20, 2023 the employer  did not ensure employees were trained and  understood the torqueing requirements need for the four 1 1/4 inch Crosby Clips.  (b) 600 Penn Street, Huntingdon PA, Blair House Apartments demolition site - On or about January 20, 2023 the employer  did not ensure employees were trained and  understood the proper way to install Crosby Clips on a wire.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.251 C04 IV

Deleted Serious Gravity 5 1 instance 5 exposed
Issued
Jul 5, 2023
Abate by
Jul 24, 2023
Penalty
Initial $7,813 · Current $0 Reduced
29 CFR  1926.251(c)(4)(iv):Wire rope(s) were used in which the rope(s) showed signs of defect(s):  (a) 600 Penn Street, Huntingdon PA, Blair House Apartments demolition site - On or about January 20, 2023 the employer  used two (2) joined 7/8 inch steel cables while conducting demolition which showed signs of defect such as broken strands and kinked wires.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $7813

1926.251 C04 II

Other-than-serious Gravity 5 1 instance 5 exposed
Issued
Jul 5, 2023
Abate by
Jul 24, 2023
Penalty
Initial $0 · Current $0
29 CFR  1926.251(c)(4)(ii): Wire rope(s) used in hoisting and lowering, or in pulling loads, did not consist of one continuous piece without knot(s) or splice(s)  (a) 600 Penn Street, Huntingdon PA, Blair House Apartments demolition site - On or about January 20, 2023 the employer joined at least two (2),  30-32 ft lengths of 7/8 inch steel cables by means of a 50-ton D-Ring to pull down sections of the building.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.251 C11

Other-than-serious Gravity 5 1 instance 5 exposed
Issued
Jul 5, 2023
Abate by
Jul 24, 2023
Penalty
Initial $7,813 · Current $6,500 Reduced
29 CFR  1926.251(c)(11): Shock loading is prohibited:  (a) 600 Penn Street, Huntingdon PA, Blair House Apartments demolition site - On or about January 20, 2023 the employer shock loaded two (2) or more  30-32 ft lengths of 7/8 inch steel cables which were joined by means of a 50-ton D-Ring while conducting demolition.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $6500
  • — Z (S) $7813

1926.850 A

Deleted Serious Gravity 10 1 instance 5 exposed
Issued
Jul 5, 2023
Abate by
Jul 24, 2023
Penalty
Initial $10,938 · Current $0 Reduced
29 CFR  1926.850(a):Evidence in writing was not available that an engineering survey performed by a competent person had been performed prior to permitting employee(s) to start demolition operations:  (a) 600 Penn Street, Huntingdon PA, Blair House Apartments demolition site - On or about January 11, 2023 the employer was conducting demolition operations on the structure without having evidence in writing that an engineering survey had been conducted by a competent person prior to start of demolition operations.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $10938

1926.850 J

Deleted Serious Gravity 5 1 instance 5 exposed
Issued
Jul 5, 2023
Abate by
Jul 24, 2023
Penalty
Initial $0 · Current $0
29 CFR 1926.850(j): The demolition did not begin at the top of the structure and proceed downward before the removal of exterior wall and floor construction below:  (a) 600 Penn Street, Huntingdon PA, Blair House Apartments demolition site - On or about January 11, 2023, employees were exposed to crushing hazard when the employer did not ensure that demolition of the structure began at the top of the structure and proceed downward before the removal of exterior walls and floor.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.602 C01 VIII C

Deleted Other-than-serious 1 instance 4 exposed
Issued
Jul 5, 2023
Abate by
Jul 24, 2023
Penalty
Initial $0 · Current $0
29 CFR  1926.602(c)(1)(viii)(C): Such protection from falling objects as indicated necessary by the operating conditions was not provided:  (a) 600 Penn Street, Huntingdon PA, Blair House Apartments demolition site - On or about January 11, 2023 employees working from a JLG 1200SJP telescoping boom lift and a SkyJack SJ86T Telescoping Boom lift were not protected from falling objects while removing brickwork from the building exterior between the 5th and 6th floor.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View G & R Excavating and Demolition, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346431711.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.