Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: OVERLY HAUTZ MOTOR BASE CO

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of OVERLY HAUTZ MOTOR BASE CO in 215 SOUTH WEST STREET, LEBANON, OH 45036 (NAICS 333249). OSHA activity number 346473259.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Overly Hautz Motor Base CO — free Get an email when a new federal OSHA severe-injury report for Overly Hautz Motor Base CO is published. One employer, no account, unsubscribe in one click.
Site address
215 SOUTH WEST STREET
City
LEBANON
State
OH
ZIP
45036
Mailing
215 SOUTH WEST STREET, LEBANON, OH 45036
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
333249
Employees
35
Ownership type
A

15 citations on file for this inspection.

1910.147 C01

Serious Gravity 10 1 instance 14 exposed
Issued
May 12, 2023
Abate by
Jun 8, 2023
Penalty
Initial $10,938 · Current $4,345 Reduced
29 CFR  1910.147(c)(1):Energy control program. The employer shall establish a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative.  a) On or before February 1, 2023, the employer did not establish an energy control program that included energy control procedures, employee training and periodic inspection before employees performed servicing or maintenance on the equipment including the Aida 200 Ton mechanical power press.
Recent events (2)
  • — I (S) $4345
  • — Z (S) $10938

1910.178 L01 I

Serious Gravity 5 1 instance 14 exposed
Issued
May 12, 2023
Abate by
Jun 8, 2023
Penalty
Initial $7,813 · Current $4,345 Reduced
29 CFR  1910.178(l)(1)(i): Safe operation. The employer shall ensure that each powered industrial truck operator is competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l).  a) On or before February 1, 2023, the employer did not ensure that each powered industrial truck operator of the Toyota 7FGCU45--BCS Serial Number 70455, Raymond 720-R35TT Serial Number 720-18-AC03702, Toyota 8FGCU25 Serial Number 14003 were competent to operate a powered industrial truck safely.
Recent events (2)
  • — I (S) $4345
  • — Z (S) $7813

1910.217 B07 III

Serious Gravity 10 1 instance 14 exposed
Issued
May 12, 2023
Abate by
Jun 8, 2023
Penalty
Initial $10,938 · Current $10,938
29 CFR  1910.217(b)(7)(iii): Machines using part revolution clutches. A means of selecting Off, "Inch," Single Stroke, and Continuous (when the continuous function is furnished) shall be supplied with the clutch/brake control to select type of operation of the press. Fixing of selection shall be by means capable of supervision by the employer.  a) On February 1, 2023, the fixing of selection of off, "inch," single stroke, and continuous was not under the supervision of the employer in that the keys for selection were left in the selection switch for the Aida 200 Ton Press serial number 00120-0162 on inch mode.
Recent events (2)
  • — I (S) $10938
  • — Z (S) $10938

1910.217 C02 I A

Serious Gravity 10 2 instances 14 exposed
Issued
May 12, 2023
Abate by
Dec 20, 2023
Penalty
Initial $10,938 · Current $0 Reduced
29 CFR 1910.217(c)(2)(i)(a): Point of operation guards. Every point of operation guard shall meet the following design, construction, application, and adjustment requirements:  (i)(a)It shall prevent entry of hands or fingers into the point of operation by reaching through, over, under or around the guard;  a) On or about January 20, 2023, the employer did not provide and ensure the usage of "point of operation guards" in that the Walsh Press & Die Co No 55 full revolution press's sides was not guarded to prevent employees from reaching, through to the point of operation.  b) On February 1, 2023, the employer did not provide and ensure the usage of "point of operation guards" in that the Aida 200 Ton Press serial number 00120-0162 part revolution press's point of operation was not guarded on all sides in that on one side of the point of operation there was no side guard, on the other side of the point of operation the pin guard was not properly set to prevent employees from reaching over, under, around or through the guard.
Recent events (4)
  • — P (S) $0
  • — P (S) $0
  • — I (S) $0

1910.217 C03 IV B

Serious Gravity 10 1 instance 2 exposed
Issued
May 12, 2023
Abate by
Jun 8, 2023
Penalty
Initial $10,938 · Current $0 Reduced
29 CFR  1910.217(c)(3)(iv)(b): Point of Operation Devices. Attachments shall be adjusted to prevent the operator from reaching into the point of operation or to withdraw the operator's hands from the point of operation before the dies close.  a) On or about January 19, 2023, the employer did not ensure that the pull back attachments were adjusted to withdraw the operator's hands from the point of operation before the dies close on the Walsh Press & Die Co No 55 full revolution press in that the press's pull out device were not set for the operator and did not pull the operator's hands out before the die closed.
Recent events (2)
  • — I (S) $0
  • — Z (S) $10938

1910.217 C03 IV D

Serious Gravity 10 1 instance 1 exposed
Issued
May 12, 2023
Abate by
Jun 8, 2023
Penalty
Initial $10,938 · Current $0 Reduced
29 CFR  1910.217(c)(3)(iv)(d): Point of operation devices. Each pull-out device in use shall be visually inspected and checked for proper adjustment at the start of each operator shift, following a new die set-up, and when operators are changed. Necessary maintenance or repair or both shall be performed and completed before the press is operated. Records of inspections and maintenance shall be kept in accordance with paragraph (e) of this section.  a) On or about January 20, 2023, the employer did not ensure the pull-out device in use on the Punch 21 Walsh Press & Die Co full revolution press was visually inspected and checked for proper adjustment at the start of each operator shift. The pullbacks were last set up on January 19, 2023.
Recent events (2)
  • — I (S) $0
  • — Z (S) $10938

1910.217 F02

Serious Gravity 10 2 instances 3 exposed
Issued
May 12, 2023
Abate by
Oct 2, 2023
Penalty
Initial $10,938 · Current $0 Reduced
29 CFR  1910.217(f)(2):Instruction to operators. The employer shall train and instruct the operator in the safe method of work before starting work on any operation covered by this section. The employer shall insure by adequate supervision that correct operating procedures are being followed.  a) On and before January 20, 2023, the employer did not adequately train and instruct the operator in safe methods of work such as but not limited to visual inspections, barrier guards, two-hand trips, and pull back devices on the Walsh Press & Die Co No 55 full revolution press on safe methods prior to starting work.  b) On and before February 1, 2023, the employer did not adequately train and instruct the operators in safe methods of work such as but not limited to visual inspections, restraint devices, two-hand controls, Type A and B gate, and presence sensing devices on the Aida 200 Ton part revolution press on safe methods prior to starting work.
Recent events (3)
  • — P (S) $0
  • — I (S) $0
  • — Z (S) $10938

1910.217 D09 I

Serious Gravity 10 1 instance 2 exposed
Issued
May 12, 2023
Abate by
Jun 8, 2023
Penalty
Initial $10,938 · Current $10,938
29 CFR 1910.217(d)(9)(i): Diesetting. The employer shall establish a diesetting procedure that will insure compliance with paragraph (c) of this section.  a) On and before January 19, 2023, the employer did not establish a diesetting procedure for equipment including the Punch 21 Walsh Press & Die Co the full revolution press that ensured compliance with paragraph (c) in regards to barrier guards, two-hand trips, and pull back devices. The press was used on January 20, 2023.  b) On or about February 1, 2023, the employer did not establish a diesetting procedure for equipment including the Aida 200 Ton Press serial number 00120-0162 the part revolution press that ensured compliance with paragraph (c) in regards to restraint devices, two-hand controls, Type A and B gate, and presence sensing devices. This was last observed on February 1, 2023.
Recent events (2)
  • — I (S) $10938
  • — Z (S) $10938

1910.217 D09 IV

Serious Gravity 10 2 instances 2 exposed
Issued
May 12, 2023
Abate by
Jun 8, 2023
Penalty
Initial $10,938 · Current $0 Reduced
29 CFR  1910.217(d)(9)(iv): Diesetting. The employer shall provide and enforce the use of safety blocks for use whenever dies are being adjusted or repaired in the press.  a) On or before January 19, 2023, the employer did not provide and enforce the use of safety blocks for use whenever dies are being adjusted or repaired on the Punch 21 Walsh Pres & Die Co No 55 full revolution press in that dies were changed without the use of safety blocks.   b) On or before February 1, 2023, the employer did not provide and enforce the use of safety blocks for use whenever dies are being adjusted or repaired on the Aida 200 Ton Press serial number 00120-0162 part revolution press in that dies were changed without the use of safety blocks.
Recent events (2)
  • — I (S) $0
  • — Z (S) $10938

1910.217 E01

Serious Gravity 10 2 instances 14 exposed
Issued
May 12, 2023
Abate by
Oct 2, 2023
Penalty
Initial $10,938 · Current $0 Reduced
29 CFR  1910.217(e)(1): Inspection, maintenance, and modification of presses. Inspection and maintenance records. The employer shall establish and follow an inspection program having a general component and a directed component.  a) On or before February 1, 2023 the employer did not establish and follow an inspection program that address, the single stroke mechanism, the guards such as the pullbacks, the selector switch key, having a general component and a directed component for the Punch 21 Walsh Press & Die Co No 55 single revolution press in that the presses were not being inspected with certification of maintenance records.  b) On or before February 1, 2023 the employer did not establish and follow an inspection program having a general component and a directed component for the Aida 200 Ton Press serial number 00120-0162 part revolution press in that the presses were not being inspected on a regular basis to include but not limited to daily, regular, and periodic inspections, and certification of maintenance records.
Recent events (3)
  • — P (S) $0
  • — I (S) $0
  • — Z (S) $10938

1910.217 E01 I

Serious Gravity 10 1 instance 14 exposed
Issued
May 12, 2023
Abate by
Oct 2, 2023
Penalty
Initial $0 · Current $0
29 CFR 1910.217(e)(1)(i): Inspection and Maintenance Records. Under the general component of the inspection program, the employer shall:  (A) Conduct periodic and regular inspections of each power press to ensure that all of its parts, auxiliary equipment, and safeguards, including the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism, are in a safe operating condition and adjustment;  (B) Perform and complete necessary maintenance or repair, or both, before operating the press; and  (C) Maintain a certification record of each inspection, and each maintenance and repair task performed, under the general component of the inspection program that includes the date of the inspection, maintenance, or repair work, the signature of the person who performed the inspection, maintenance, or repair work, and the serial number, or other identifier, of the power press inspected, maintained, and repaired.   a) On or before February 1, 2023, the employer did not develop or implement a general component of the inspection program that included the requirements of (A) through (C), in that employees were not conducting inspections of the Walsh Press & Die Co No 55 full revolution and Aida 200 Ton part revolution presses.
Recent events (3)
  • — P (S) $0
  • — I (S) $0
  • — Z (S) $0

1910.217 E03

Serious Gravity 10 2 instances 3 exposed
Issued
May 12, 2023
Abate by
Oct 2, 2023
Penalty
Initial $10,938 · Current $0 Reduced
29 CFR  1910.217(e)(3):Training of maintenance personnel. It shall be the responsibility of the employer to insure the original and continuing competence of personnel caring for, inspecting, and maintaining power presses.  a) On and before February 1, 2023 the employers did not ensure the original and continuing competence of personnel caring for, inspecting, and maintaining the Walsh Press & Die Co No 55 full revolution press.   b) On and before February 1, 2023 the employers did not ensure the original and continuing competence of personnel caring for, inspecting, and maintaining the Aida 200 Ton part revolution press.
Recent events (3)
  • — P (S) $0
  • — I (S) $0
  • — Z (S) $10938

1910.217 E01 II

Serious Gravity 10 1 instance 3 exposed
Issued
May 12, 2023
Abate by
Oct 2, 2023
Penalty
Initial $0 · Current $0
29 CFR  1910.217(e)(1)(ii):Inspection and Maintenance Records. Under the directed component of the inspection program, the employer shall:  (A) Inspect and test each press on a regular basis at least once a week to determine the condition of the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism;  (B) Perform and complete necessary maintenance or repair, or both, on the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism before operating the press; and  (C) Maintain a certification record of each maintenance task performed under the directed component of the inspection program that includes the date of the maintenance task, the signature of the person who performed the maintenance task, and the serial number, or other identifier, of the power press maintained.  Note to paragraph (e)(1)(ii): Inspections of the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism conducted under the directed component of the inspection program are exempt from the requirement to maintain certification records specified by paragraph (e)(1)(i)(C) of this section, but inspections of the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism conducted under the general component of the inspection program are not exempt from this requirement.  a) On or before February 1, 2023, the employer did not develop or implement a directed component of the inspection program that included the requirements of (A) through (C), in that employees were not conducting inspections of the Walsh Press & Die Co No 55 full revolution and Aida 200 Ton part revolution presses.
Recent events (3)
  • — P (S) $0
  • — I (S) $0
  • — Z (S) $0

1910.132 D02

Deleted Other-than-serious 1 instance 14 exposed
Issued
May 12, 2023
Abate by
Jun 8, 2023
Penalty
Initial $877 · Current $0 Reduced
29 CFR 1910.132(d)(2): Hazard assessment and equipment selection. The employer shall verify that the required workplace hazard assessment has been performed through a written certification that identifies the workplace evaluated; the person certifying that the evaluation has been performed; the date(s) of the hazard assessment; and, which identifies the document as a certification of hazard assessment.  a) On or before February 1, 2023 the employer requires  employees to wear safety glasses, safety toe shoes, and welding personal protective equipment but did not verify that the required workplace hazard assessment has been performed through a written certification.
Recent events (2)
  • — I (O) $0
  • — Z (O) $877

1910.178 Q07

Other-than-serious 1 instance 14 exposed
Issued
May 12, 2023
Abate by
Jun 8, 2023
Penalty
Initial $877 · Current $0 Reduced
29 CFR  1910.178(q)(7): Maintenance of Industrial Trucks. Industrial trucks shall be examined before being placed in service, and shall not be placed in service if the examination shows any condition adversely affecting the safety of the vehicle. Such examination shall be made at least daily. Where industrial trucks are used on a round-the-clock basis, they shall be examined after each shift. Defects when found shall be immediately reported and corrected.  a) On or before February 1, 2023, the employer did not ensure industrial trucks were examined before being placed in service, in that the Toyota 7FGCU45--BCS Serial Number 70455, Raymond 720-R35TT Serial Number 720-18-AC03702, Toyota 8FGCU25 Serial Number 14003 industrial trucks were not inspected prior to use.
Recent events (2)
  • — I (O) $0
  • — Z (O) $877

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346473259.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.