VIRGINIA BEACH, VA —
OSHA Inspection: NAVAL SURFACE WARFARE CENTER DAHLGREN DIVISION, DAM NECK ACTIVITY
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of NAVAL SURFACE WARFARE CENTER DAHLGREN DIVISION, DAM NECK ACTIVITY in 1896 LASER ROAD, VIRGINIA BEACH, VA 23460 (NAICS 928110). OSHA activity number 346500283.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Site address
- 1896 LASER ROAD
- City
- VIRGINIA BEACH
- State
- VA
- ZIP
- 23460
- Mailing
- 1922 REGULUS AVENUE BUILDING 127 HOPPER HALL, VIRGINIA BEACH, VA 23460
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 928110
- Employees
- 500
- Ownership type
- D
Citations
7 citations on file for this inspection.
1926.1101 E01
- Issued
- Apr 27, 2023
- Abate by
- May 16, 2023
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1926.1101(e)(1): All Class I, II and III asbestos work was not conducted within regulated areas which complied with the requirements of 29 CFR 1926.1101(e), paragraphs (2), (3), (4) and (5): a) Dam Neck Annex, Building 127, Room S128; On or around 2-9-23, and times prior thereto, employees were exposed to asbestos due to removing asbestos positive floor tile and mastic (Class II work) without a regulated area which demarcated the area, restricted access, required respiratory protection in the area, prohibit high risk activities (eating, drinking, smoking ,etc.), and ensure that all asbestos work performed within regulated areas is supervised by a competent person. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 F02 I
- Issued
- Apr 27, 2023
- Abate by
- May 16, 2023
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1926.1101(f)(2)(i):The employer with a work operation covered by the asbestos standard did not ensure that a "competent person" conducted an exposure assessment immediately before or at the initiation of the operation to ascertain expected exposures during that operation or workplace: a) Dam Neck Annex, Building 127, Room S128; On or around 2-9-23, and times prior thereto, employees were exposed to asbestos due to removing asbestos positive floor tile and mastic (Class II work) without the exposure assessment from a competent person. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 G01
- Issued
- Apr 27, 2023
- Abate by
- May 16, 2023
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1926.1101(g)(1):The employer did not use engineering controls and work practices listed at (g)(1)(I) through (g)(1)(iii) of this section in all operations covered by 29 CFR 1926.1101, regardless of the levels of the exposure: a) Dam Neck Annex, Building 127, Room S128; On or around 2-9-23, and times prior thereto, employees were exposed to asbestos due to removing asbestos positive floor tile and mastic (Class II work) without engineering controls. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1926.1101 G08 I D
- Issued
- Apr 27, 2023
- Abate by
- May 16, 2023
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1926.1101(g)(8)(i)(D): Wet methods were not used as required for all scraping of residual adhesive and/or backing: a) Dam Neck Annex, Building 127, Room S128; On or around 2-9-23, and times prior thereto, employees were exposed to asbestos due to removing asbestos positive floor tile and mastic (Class II work) by using a hand scraper without wet methods. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1926.1101 G08 I E
- Issued
- Apr 27, 2023
- Abate by
- May 16, 2023
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1926.1101(g)(8)(i)(E):Where employees removed asbestos flooring materials which contain ACM, dry sweeping was not prohibited: a) Dam Neck Annex, Building 127, Room S128; On or around 2-9-23, and times prior thereto, employees were exposed to asbestos due to performing dry sweeping for housekeeping while removing asbestos positive floor tile and mastic (Class II work). Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1926.1101 G08 I G
- Issued
- Apr 27, 2023
- Abate by
- May 16, 2023
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1926.1101(g)(8)(i)(G):Floor tiles were not removed intact: a) Dam Neck Annex, Building 127, Room S128; On or around 2-9-23, and times prior thereto, employees were exposed to asbestos due to removing asbestos positive floor tile and mastic (Class II work) without ensuring the tiles were intact during the removal process. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1926.1101 L02
- Issued
- Apr 27, 2023
- Abate by
- May 16, 2023
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1926.1101(l)(2):Asbestos waste, scrap, debris, bags, containers, equipment, and contaminated clothing consigned for disposal was not collected and disposed of in sealed, labeled, impermeable bags or other closed, labeled, impermeable containers: a) Dam Neck Annex, Building 127, Room S128; On or around 2-9-23, and times prior thereto, employees were exposed to asbestos due to disposing asbestos positive floor tile and mastic waste into regular waste bins without encapsulating or labeling that asbestos waste in any way. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (S) $0
More inspections in this industry (NAICS 928110)
More inspections in VA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346500283.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.