OSHA Inspection: ARLAND TOOL & MANUFACTURING, INC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ARLAND TOOL & MANUFACTURING, INC in 45 FREIGHT HOUSE RD, WEST BROOKFIELD, MA 01585 (NAICS 332721). OSHA activity number 346630296.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ARLAND TOOL & MANUFACTURING, INC
- Site address
- 45 FREIGHT HOUSE RD
- City
- WEST BROOKFIELD
- State
- MA
- ZIP
- 01585
- Mailing
- 421 MAIN STREET P.O. BOX 207, STURBRIDGE, MA 01566
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332721
- Employees
- 17
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.147 C04 I
- Issued
- May 25, 2023
- Abate by
- Jul 14, 2023
- Penalty
- Initial $10,938 · Current $5,470 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: 45 Freight House Rd, West Brookfield, MA: On and before April 13, 2023, employees who set up machines, including the Kearny & Trecker machine, only pushed in the emergency stop buttons and did not utilize the written energy control procedures.
Recent events (2)
- — I (S) $5470
- — Z (S) $10938
1910.147 C07 I A
- Issued
- May 25, 2023
- Abate by
- Jul 14, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(7)(i)(A): Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation: 45 Freight House Rd, West Brookfield, MA: On and before April 13, 2023, employees who set up machines, including the Kearny & Trecker machine, were not trained as authorized employees and were not specifically trained on the written energy control procedures they were expected to use.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C04 II B
- Issued
- May 25, 2023
- Abate by
- Jul 14, 2023
- Penalty
- Initial $10,938 · Current $5,470 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(B):The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. 45 Freight House Rd, West Brookfield, MA: On and before April 13, 2023, some machine specific energy control procedures did not outline the steps to control all the hazardous energy sources. The Bliss Mechanical Power Press procedure did not include the stored/kinetic energy of the flywheel or the stored energy of the ram that would need to be blocked or restrained during set up, removal, or replacement of the die.
Recent events (2)
- — I (S) $5470
- — Z (S) $10938
1910.147 C04 II C
- Issued
- May 25, 2023
- Abate by
- Jul 14, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(C):The energy control procedure did not clearly and specifically outline the steps for placement, removal and transfer of lockout devices or tagout devices and the responsibility for them. 45 Freight House Rd, West Brookfield, MA: On and before April 13, 2023, some machine specific energy control procedures did not identify appropriate lockout devices to control hazardous energy sources. The energy control procedure for the Komo Asset number 1847 incorrectly listed a ball valve lockout device to lock out a pneumatic quick-disconnect.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C04 II D
- Issued
- May 25, 2023
- Abate by
- Jul 14, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(D):The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control 45 Freight House Rd, West Brookfield, MA: On and before April 13, 2023, none of the machine specific energy control procedures listed the requirement, or any steps, to verify the effectiveness of the energy control measures.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C06 I
- Issued
- May 25, 2023
- Abate by
- Jul 14, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i):The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: 45 Freight House Rd, West Brookfield, MA: On and for three years before April 4, 2023, the employer had not performed a comprehensive periodic inspection of energy control procedures including, but not limited to the Kearny & Trecker machine, at least annually to verify that each procedure was adequate and being properly used by employees. *Abatement Notes: A periodic inspection shall include the following elements: - Appointment of an authorized employee to inspect each unique procedure for inaccuracies during an actual energy control task - A review by inspector with each authorized employee, of that employee's responsibilities under each energy control procedure they are authorized to use - Certification that the periodic inspections have been performed by identifying the machines or equipment on which the energy control procedures were being utilized, the dates of the inspections, the employees included in the inspections, and the persons performing the inspections *Abatement notes are intended only to provide clarity regarding existing requirements under the law or agency policies. Abatement notes do not create (or diminish) legal obligations under the Occupational Safety and Health Act.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Arland Tool & Manufacturing, INC
View Arland Tool & Manufacturing, INC's full OSHA safety record →
More inspections in this industry (NAICS 332721)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346630296.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.