Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: NEAL ESHLEMAN

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of NEAL ESHLEMAN in 2850 HORSESHOE PIKE, PALMYRA, PA 17078 (NAICS 238910). OSHA activity number 346690639.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Neal Eshleman — free Get an email when a new federal OSHA severe-injury report for Neal Eshleman is published. One employer, no account, unsubscribe in one click.
Establishment
NEAL ESHLEMAN
Site address
2850 HORSESHOE PIKE
City
PALMYRA
State
PA
ZIP
17078
Mailing
114 SONNES ROAD, RICHLAND, PA 17087
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238910
Employees
3
Ownership type
A

4 citations on file for this inspection.

1926.100 A

Serious Gravity 5 1 instance 3 exposed
Issued
Aug 31, 2023
Abate by
Sep 27, 2023
Penalty
Initial $0 · Current $1,900
29 CFR  1926.100(a): Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:   a) Job Site - Employees were permitted to work near and around demolition operations without wearing head protection and were exposed to possible head injury from falling or flying objects, on or about May 8, 2023.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1900
  • — Z (S) $0

1926.300 B01

Serious Gravity 5 1 instance 1 exposed
Issued
Aug 31, 2023
Abate by
Sep 27, 2023
Penalty
Initial $2,679 · Current $1,900 Reduced
29 CFR 1926.300(b)(1): Power operated tool(s), designed to accommodate guards, were not equipped with such guards when in use:  a) Job Site - An employee used an unguarded Milwaukee angle grinder to cut pipes , on or about May 5, 2023.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1900
  • — Z (S) $2679

1926.501 B01

Serious Gravity 5 1 instance 3 exposed
Issued
Aug 31, 2023
Abate by
Sep 27, 2023
Penalty
Initial $4,018 · Current $1,900 Reduced
29 CFR  1926.501(b)(1):Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems:  a) 1st Floor - Employees walked along floor joists approximately 6 feet - 9 inches high above the ground and were not protected from falling, on or about May 5, 2023.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1900
  • — Z (S) $4018

1926.850 A

Deleted Serious Gravity 10 1 instance 3 exposed
Issued
Aug 31, 2023
Abate by
Sep 27, 2023
Penalty
Initial $4,688 · Current $0 Reduced
29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations:   a) Job Site - Prior to permitting employees starting demolition on a 2-story apartment building, the employer did not have an engineering survey of the building performed, exposing employees to struck-by and crushing hazards from a building collapse, on or about May 5, 2023.  Abatement certification and documentation are required within 10 days after the abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4688

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346690639.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.