Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: J.M.S CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of J.M.S CONSTRUCTION, LLC in 31 RYCROFT ROAD LOT #21, MECHANICSBURG, PA 17050 (NAICS 238130). OSHA activity number 346725369.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch J.M.S Construction, LLC — free Get an email when a new federal OSHA severe-injury report for J.M.S Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
31 RYCROFT ROAD LOT #21
City
MECHANICSBURG
State
PA
ZIP
17050
Mailing
6168 BEAVER DAM ROAD, NARVON, PA 17555
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
6
Ownership type
A

2 citations on file for this inspection.

1926.102 A01

Serious Gravity 5 1 instance 6 exposed
Issued
Jul 17, 2023
Abate by
Jul 31, 2023
Penalty
Initial $3,572 · Current $3,572
29 CFR  1926.102(a)(1):29 CFR 1926.102(a)(1): The employer did not ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation:  a)  Jobsite, 31 Rycroft Road (Lot #21)  Mechanicsburg, PA - On or about May 24, 2023,  the employer did not ensure that eye protective equipment was used when employees were exposed to eye injury while using pneumatic nail guns for framing.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $3572

1926.501 B13

Serious Gravity 10 4 instances 6 exposed
Issued
Jul 17, 2023
Abate by
Jul 31, 2023
Penalty
Initial $6,250 · Current $6,250
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b):  a)  Jobsite, 31 Rycroft Road (Lot #21)  Mechanicsburg, PA - On or about May 24, 2023, employees performing residential home construction on a multi level stick built home were exposed to fall hazards of greater than 20 feet from the trusses to grade, employees were not utilizing any means of fall protection.   b) Jobsite, 31 Rycroft Road (Lot #21)  Mechanicsburg, PA - On or about May 24, 2023, employees performing residential home construction on a multi level stick built home were exposed to fall hazards of greater than 8 feet from trusses to second floor , employees were not utilizing any means of fall protection.   c) Jobsite, 31 Rycroft Road (Lot #21)  Mechanicsburg, PA - On or about May 24, 2023, employees performing residential home construction on a multi level stick built home were exposed to fall hazards of greater than 8 feet from second floor to the first floor, employees were not utilizing any means of fall protection.   d) Jobsite, 31 Rycroft Road (Lot #21)  Mechanicsburg, PA - On or about May 24, 2023, employees performing residential home construction on a multi level stick built home were exposed to fall hazards of greater than 15 feet from second floor to the exterior dumpster, employees were not utilizing any means of fall protection.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $6250

View J.M.S Construction, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346725369.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.