Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MANNAS PRECAST CONCRETE, LLC

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of MANNAS PRECAST CONCRETE, LLC in 2928 NICHOLS AVENUE, BAY CITY, TX 77414 (NAICS 339999). OSHA activity number 346743263.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Mannas Precast Concrete, LLC — free Get an email when a new federal OSHA severe-injury report for Mannas Precast Concrete, LLC is published. One employer, no account, unsubscribe in one click.
Site address
2928 NICHOLS AVENUE
City
BAY CITY
State
TX
ZIP
77414
Mailing
2928 NICHOLS AVENUE, BAY CITY, TX 77414
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
339999
Employees
6
Ownership type
A

2 citations on file for this inspection.

1910.178 L01 II

Serious Gravity 10 1 instance 6 exposed
Issued
Nov 27, 2023
Abate by
Dec 7, 2023
Penalty
Initial $4,688 · Current $2,813 Reduced
29 CFR 1910.178(l)(1)(ii): The employer did not ensure that each operator had successfully completed the training required by paragraph (l), except as permitted by paragraph (l)(5), prior to permitting an employee to operate a powered industrial truck:   On or about May 31, 2023, and at times prior thereto, the employer did not provide a training and evaluation to the operators before allowing employees to use powered industrial trucks. These conditions exposed employees to struck-by and caught-in-between hazards.
Recent events (2)
  • — I (S) $2812.8
  • — Z (S) $4688

1910.1200 E01

Other-than-serious 1 instance 6 exposed
Issued
Nov 27, 2023
Abate by
Dec 7, 2023
Penalty
Initial $0 · Current $0

Hazardous substances 05771340136720379000

29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:    On or about May 31, 2023, and at times prior thereto, the employer had not developed and maintained a written Hazard Communication program, which would address labeling, and other forms of warning on chemicals containers, Safety Data Sheets and employees' information and training on the hazards associated with chemicals used at this site.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346743263.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.