OSHA Inspection: GARNER CONCRETE CONSTRUCTION LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of GARNER CONCRETE CONSTRUCTION LLC in 2567 EMERSON ST., DENVER, CO 80218 (NAICS 238170). OSHA activity number 346752371.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Garner Concrete Construction LLC — free Get an email when a new federal OSHA severe-injury report for Garner Concrete Construction LLC is published. One employer, no account, unsubscribe in one click.
Site address
2567 EMERSON ST.
City
DENVER
State
CO
ZIP
80218
Mailing
1757 LIMA ST., AURORA, CO 80010
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
4
Ownership type
A

6 citations on file for this inspection.

1926.451 F07

Serious Gravity 10 1 instance 4 exposed
Issued
Nov 7, 2023
Abate by
Dec 12, 2023
Penalty
Initial $4,688 · Current $4,688
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: Such activities were not performed only by experienced and trained employees selected for such work by the competent person:  (a) On and before June 7, 2023, the employer did not ensure that a fabricated tube frame scaffold was erected with the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling, or alteration.  Employees and the company owner, worked on the second and third level of the fabricated tube frame scaffold which was missing end-rails and mid-rails both on the exterior and interior of the scaffold, improper and missing planking on all three levels, missing mud seals and no ladder for access.  This condition exposed employees and the owner to a fall of approximately 15 feet.
Recent events (2)
  • — I (S) $4688
  • — Z (S) $4688

1926.451 B01

Serious Gravity 10 2 instances 4 exposed
Issued
Nov 7, 2023
Abate by
Dec 12, 2023
Penalty
Initial $0 · Current $0
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):  (a)	On and before June 7, 2023, the creating and exposing employer did not ensure that a fabricated tube frame scaffold was erected with multiple levels of the scaffold not being fully planked while employees worked form the third level. This condition exposed employees and the owner to a fall of approximately 15 feet.  (b)  On and before June 7, 2023, the creating and exposing employer did not ensure that a fabricated tube frame scaffold was erected with multiple levels of the scaffold not being fully planked while employees worked form the second and third level. This condition exposed employees and the owner to a fall of approximately 15 feet.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 B10

Serious Gravity 10 2 instances 4 exposed
Issued
Nov 7, 2023
Abate by
Dec 12, 2023
Penalty
Initial $0 · Current $0
29 CFR 1926.451(b)(10): Scaffold components manufactured by different manufacturers shall not be intermixed unless the components fit together without force and the scaffold's structural integrity is maintained by the user. Scaffold components manufactured by different manufacturers shall not be modified in order to intermix them unless a competent person determines the resulting scaffold is structurally sound.  (a)	On and before June 7, 2023, the employer did not ensure that employees were protected from a fall from elevation while working on the third level of the fabricated tube frame scaffold in that end-rails and mid-rails, both on the exterior and interior of the scaffold, were not installed and no personal fall arrest systems were worn by employees.  This condition exposed employees and the general contractor to a fall of approximately 15 feet.  (b) On and before June 7, 2023, the employer did not ensure that employees were protected from a fall from elevation while working on the second and third level of the fabricated tube frame scaffold in that end-rails and mid-rails, both on the exterior and interior of the scaffold, were not installed and no personal fall arrest systems were worn by employees.  This condition exposed employees and the general contractor to a fall of approximately 15 feet.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 C02

Serious Gravity 10 2 instances 4 exposed
Issued
Nov 7, 2023
Abate by
Dec 12, 2023
Penalty
Initial $0 · Current $0
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, shall bear on base plates and mud sills or other adequate firm foundation:  (a)	On and before June 7, 2023, the employer did not ensure that employees were protected from a fall from elevation while working on the third level of the fabricated tube frame scaffold in that mud seals and base plates were not used on scaffolding which was not properly erected or supported by a certified, qualified or competent person.  This condition exposed employees and the general contractor to a fall of approximately 15 feet.  (b)	On and before June 7, 2023, the employer did not ensure that employees were protected from a fall from elevation while working on the second and third level of the fabricated tube frame scaffold in that mud seals and base plates were not used on scaffolding which was not properly erected or supported by a certified, qualified or competent person.  This condition exposed employees and the general contractor to a fall of approximately 10 to 15 feet.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 E01

Serious Gravity 10 2 instances 4 exposed
Issued
Nov 7, 2023
Abate by
Dec 12, 2023
Penalty
Initial $0 · Current $0
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Cross braces were used as a means of access by employees:  (a)	On and before June 7, 2023, the employer did not ensure that employees were protected from a fall from elevation while working on the third level of the fabricated tube frame scaffold in that no ladder access was provided on scaffolding which was not properly erected or supported by a certified, qualified or competent person.  This condition exposed employees and the general contractor to a fall of approximately 15 feet.  (b)	On and before June 7, 2023, the employer did not ensure that employees were protected from a fall from elevation while working on the second and third level of the fabricated tube frame scaffold in that no ladder access was provided on scaffolding which was not properly erected or supported by a certified, qualified or competent person.  This condition exposed employees and the general contractor to a fall of approximately 10 to 15 feet.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01

Serious Gravity 10 2 instances 4 exposed
Issued
Nov 7, 2023
Abate by
Dec 12, 2023
Penalty
Initial $3,984 · Current $3,984
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level.  (a) On and before June 7, 2023 the employer did not ensure that employees were protected from a fall from elevation while working on the third level of the fabricated tube frame scaffold in that end-rails and mid-rails, both on the exterior and interior of the scaffold, were not installed and no personal fall arrest systems were worn by employees.  This condition exposed employees and the general contractor to a fall of approximately 15 feet.  (b) On and before June 7, 2023 the employer did not ensure that employees were protected from a fall from elevation while working on the third level of the fabricated tube frame scaffold in that end-rails and mid-rails, both on the exterior and interior of the scaffold, were not installed and no personal fall arrest systems were worn by employees.  This condition exposed employees and the general contractor to a fall of approximately 15 feet.
Recent events (2)
  • — I (S) $3984
  • — Z (S) $3984

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346752371.